New Offshore Terminal Designs May Expedite LNG Deliveries

Wednesday, June 11, 2003
In the wake of announcements by the Federal Reserve about the need for more natural gas, Saipem Group, Single Buoy Moorings, Bluewater Offshore, Spectrum Energy Services, Hoegh LNG and Aker Kvaerner will discuss radically new concepts for receiving terminals at an industry meeting in Houston, June 19 and 20. "The LNG industry has typically required at least five years to put new supply chains into place. With local community opposition to onshore terminals running high, these lead-times may grow even longer," said Bob Nimocks, president of Zeus Development Corporation, a company that is conducting industry research to investigate new designs. "Consequently, the industry is searching for other ways to get gas into pipeline grids, and terminals located far offshore are one such way." Two proposed liquefied natural gas (LNG) terminals -- one in the Gulf of Mexico and one offshore California -- will use existing infrastructure to expedite construction and operation. The LNG can come from distant gas reserves located as far away as West Africa and Australia. The Gulf of Mexico terminal proposed by Freeport-McMoRan Sulphur LLC will use a large surface platform built as part of an offshore sulfur mine. The company is preparing a Deepwater Port license application to receive and process LNG and compressed natural gas shipments. The facility will be able to store very large amounts of natural gas underground. Vice President David Landry will provide a review of the project during the Houston conference, which is entitled LNG: Non-Traditional Concepts for Receiving and Regasification. The proposed California terminal will use a depleted gas-production platform connected to an undersea pipeline offshore Oxnard. Crystal Energy has signed a long-term lease to use Platform Grace, set in federal waters 11 miles offshore. Bill Perkins, president of the company, will provide a cost build up of their project during the conference. In addition to these two projects, numerous new designs -- running the spectrum from manmade islands, to permanently moored floating storage ships, to modified LNG tankers that can pump and vaporize LNG directly into subsea pipelines -- will be presented.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Resolve Maritime Academy's New Wet Trainer Facility

Resolve Maritime Academy says it has started on the construction of a new, two-story wet trainer, larger and more expansive than its original, the L/V Gray Manatee.

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Messer's CEO Norville Announces Retirement

Bill Heller to assume the position as Messer Cuttings Systems’ President and CEO Gary Norville started at Messer Cuttings Systems Inc. in September 1980 selling and installing cutting machines.

Offshore

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

Floating Production: $1.2b Speculative FLNG Ordered

The floating production business continues to be very strong, particularly in the LNG gas processing sector.  Last month saw a speculatively ordered floating liquefaction plant – a $1.

FLNG Prelude: A New Dawn in the Age of Maritime & Energy

Longer than four football fields, as big as six Nimitz-class aircraft carriers and almost as tall as the Taipei 101 skyscraper, Royal Dutch Shell PLC is hoping that its record-setting,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Port Authority Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2828 sec (4 req/sec)