Newport News Shipbuilding Awarded Contract

Thursday, December 12, 2002
Newport News Shipbuilding and Drydock Co., Newport News, Va., is being awarded a $143,103,367 cost-plus-fixed-fee modification for FY03 advanced planning and material procurement for the refueling and complex overhaul (RCOH) of the USS Carl Vinson. Work will be performed at Newport News (97 percent) and Puget Sound, Wash. (3 percent), and is to be completed by November 2003. Contract funds will not expire at the end of the current fiscal year. This contract was not competitively procured. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


TMS Cardiff Gas Orders First LPG Carriers

TMS Cardiff Gas Ltd. has signed a contract with Hyundai Heavy Industries of Korea for the construction of two 78,700 cbm LPG carriers with the option to build another two.

IHC Services Secures Dredger Repair Contract

IHC Services, a subsidiary of Dutch shipbuilder and repairer Royal IHC, informs it has secured an order for a renovation project for a dredging vessel owned by Huta Marine Works Ltd in Saudi Arabia.

Kruszewski Joins Braemar Engineering

Braemar Engineering, the specialist maritime engineering consultancy, today announced the appointment of Chis Kruszewski to the role of Senior Electrical Engineer in its Offshore,

Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2746 sec (4 req/sec)