Northrop Grumman Announce Contract Modification

Monday, December 30, 2002
Northrop Grumman Newport News Shipbuilding and Drydock Co., Newport News, Va., is being awarded a $34,627,909 cost-plus-fixed-fee modification to a previously awarded contract (N00024-00-C-2108) for continued research and design development for the future aircraft carrier program, CVNX. Newport News Shipbuilding will provide all services and material for research studies, design efforts, production planning, further definition of initiatives in order to reduce CVNX-1 total ownership costs and other data to support an integrated product data environment for CVNX-1. Work will be performed in Newport News, Va. (95%), and Groton, Conn. (5%), and is to be completed by December 2003. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

MOL Signs Long-Term Charter with Uruguayan JV for FSRU

Japanese shipping company Mitsui O.S.K. Lines, has, through its wholly-owned subsidiary Lakler S.A., agreed to conclude a charter contract with Gas Sayago, for

Team Britannia, GAC Inks Partnership Deal

As Team Britannia prepares for its bid to break the round-the-world powerboat record later this year, GAC has been named their official shipping and logistics partner.

Libya's PFG to Lift Terminal Blockades

Petroleum Facilities Guard has blocked terminals for months. Ras Lanuf, Es Sider terminals damaged by fighting. Libya's Petroleum Facilities Guard (PFG) will

Finance

Canada Seek to contain Oil Spill

Authorities are building a new containment boom to fight an oil spill in a major western Canadian river, officials said on Saturday, after the spill breached a

Ecuador Pays $112 mln Award to Chevron

Ecuador has paid $112 million to energy company Chevron Corp over a four-decade-old contract dispute, even though it remains in disagreement, the head of the central bank has said.

NASSCO Bags USS Oak Hill Modification Award

General Dynamics NASSCO-Norfolk was awarded a $42 million cost-plus-award-fee modification to a previously awarded contract for the repair and alteration for the USS Oak Hill (LSD-51).

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0761 sec (13 req/sec)