Northrop Grumman Awarded $1.94B Contract

Wednesday, November 30, 2005
The U.S. Navy has awarded Northrop Grumman Corporation a contract valued at approximately $1.94 billion for the refueling and complex overhaul of the aircraft carrier USS Carl Vinson (CVN 70).

The work will be performed by the company’s Newport News sector and will include the refueling of the ship’s reactors, as well as extensive modernization work to more than 2,300 compartments and hundreds of systems. In addition, nearly 3,000 valves will be replaced and another 600 will be overhauled in various ship systems. Major upgrades will be made to the flight deck, catapults, combat systems and the island. The top two levels of the island will be removed and replaced with a reconfigured structure to provide enhanced operability and support a new antenna mast designed for more modern sensors. “This project is very large and complex, and requires a tremendous Newport News and Navy team effort,” said Ken Mahler, vice president of aircraft carrier overhauls for Northrop Grumman Newport News. “We’ll touch almost every piece of the ship, refurbishing existing equipment and installing the latest advancements in technology to increase and modernize Vinson’s capabilities and mission effectiveness when she returns to the fleet for another 23 years of service.”

Work is scheduled to last more than three years and will be the ship's one and only refueling and complex overhaul in a 50-year life span. Vinson is the third ship of the Nimitz class to undergo this major life-cycle milestone. The ship arrived at the company’s Newport News sector on Nov. 11. More than 3,500 Northrop Grumman Newport News employees will be working aboard Vinson during peak periods of the project. Named for former U.S. Rep. Carl Vinson, the carrier Vinson was built at Northrop Grumman Newport News and christened in 1980. The congressman attended the christening ceremony at age 96 and became the first living American to have a Navy ship named in his honor. The ship was commissioned by the Navy in 1982.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ocean Rig, Petrobras Agree to $1.1b Drill Ships Lease

Cyprus-based Ocean Rig UDW Inc said on Monday that it signed a $1.1 billion three-year contract with Brazil's state-run oil company, Petroleo Brasileiro SA, to

Rolls-Royce to Design, Equip Stern Trawler for Ramoen

The Armon shipyard in Gijón, Spain has entered into a contract to build a new Stern Trawler for the Norwegian fishing company Ramoen. The vessel will be a Rolls-Royce design,

India to Develop Iran's Chabahar Port

India will float a company to develop Iran's Chabahar Port, a government statement said on Saturday, as New Delhi aims to take advantage of a thaw in Tehran's relations with world powers.

Shipbuilding

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

Messer to Debut MetalMaster Xcel

Messer Cutting Systems said it has answered the call from manufacturers that have been demanding a faster, more accurate way of producing cut parts. Messer’s

Rolls-Royce Expands in the Canary Islands

Rolls-Royce announced it has signed a cooperation agreement with the Astican Shipyard in Las Palmas, Canary Islands that it said will enhance the service capabilities

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1952 sec (5 req/sec)