Northrop Grumman Awarded $257 Million Contract

Monday, February 14, 2005
Northrop Grumman Corporation has been awarded a $257 million contract from the U.S. Navy for work on the aircraft carrier USS George Washington (CVN 73). This work follows more than a year of advance planning efforts conducted under the contract awarded in Dec. 2003. Northrop Grumman's Newport News sector is the prime contractor for this award. "We've worked closely with the Navy and Navy shipyards during the planning stage of this project to develop best practices that will help us now as we begin the maintenance period," said Bob Gunter, senior vice president of the Aircraft Carrier Program at Northrop Grumman Newport News. "This collaboration has laid the groundwork for a successful partnership and a successful availability." The George Washington arrived at the Newport News shipyard on Jan. 27 for a 10-and-a-half month maintenance availability, which will include dry-docking for approximately seven months. Work will include repair and refurbishment of the hull, sea chests, shafting, propellers and rudders; blasting and coating of numerous tanks; modernization of spaces to support the F/A-18 Super Hornet aircraft equipment and weapons stowage systems; enhancements to crew living areas; scheduled maintenance on propulsion plant systems and repair and inspections on a variety of ship systems. Launched in 1990 and delivered to the Navy in 1992, the George Washington is the sixth nuclear-powered Nimitz-class aircraft carrier built by Northrop Grumman Newport News. At 1,092 feet, with a flight deck width of 252 feet and a displacement of 97,000 tons, the George Washington can travel in excess of 30 knots. This is the first time the ship has returned to the Newport News shipyard since it was delivered more than 12 years ago.
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

5th Floating Accommodation for Lerwick

A further accommodation ship, Ocean Atlantic, is due at Lerwick on Monday 27 April 2015 and is on its way from Portland in Dorset. As with the other floating accommodation at the port,

Double Order for Super Gloria Reachstacker

Kalmar, part of Cargotec, has gained an order for two Super Gloria reachstackers from Tadarsa Logistics S.L. in Aviles, Spain. The largest reachstackers ever built,

BIMCO Welcomes EU Decision on Migrants

BIMCO has stated today that it appreciates the new efforts by EU leaders to reduce increasing reliance on merchant shipping to rescue the growing numbers of

Navy

BIMCO Welcomes EU Decision on Migrants

BIMCO has stated today that it appreciates the new efforts by EU leaders to reduce increasing reliance on merchant shipping to rescue the growing numbers of

HMS Prince of Wales Bridge Sets Sail

The bridge section of the second Queen Elizabeth Class aircraft carrier set sail today from Glasgow on its first sea voyage to Rosyth.   Upper Block 07 is where

The German Shipbuilding Rebound

German shipbuilding has made a significant turnaround. The country’s shipbuilding industry has seen increases in the number of employees, orders and deliveries compared to 2013,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Salvage Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1918 sec (5 req/sec)