Northrop Grumman Shipbuilding Team Honored by U.S. Coast Guard

Thursday, November 17, 2005
The U.S. Coast Guard honored a Northrop Grumman Corporation shipbuilding team for their Hurricane Katrina recovery performance on the first Deepwater National Security Cutter. Northrop Grumman's Ship Systems sector resumed shipbuilding just two weeks after Hurricane Katrina. The company is building the National Security Cutter at their Pascagoula facility, under contract from Integrated Coast Guard Systems LLP, a joint venture of Northrop Grumman and Lockheed Martin Corporation. U.S. Coast Guard Rear Adm. Patrick Stillman, program executive officer for the Integrated Deepwater System program, praised the shipbuilding team, saying, "What you have collectively experienced here with Katrina and the challenge of coming together in order to infuse your character, competency, commitment and most of all your sense of community into the decks of this ship is a legacy. It is a legacy that will take young men and women to sea and mold their character as yours has been molded in confronting the challenges that mark our existence." Stillman toured the ship with shipyard management and acknowledged the efforts of 30 shipbuilders by presenting them with Deepwater Awards for Excellence. The awards read, "We are pleased to commend you for your exemplary performance of duty while assigned to the Integrated Deepwater System program and team during the recovery and restoration efforts resulting from Hurricane Katrina." "I can't thank you enough for what you've done," Stillman said, at the end of his tour. "There is no question in my mind that this ship will sail carrying a standard of excellence that is unrivaled because of you." The National Security Cutter will be a 418-foot ship with a 4,300-ton displacement at full load. Powered by a twin-screw combined diesel-and-gas turbine-power propulsion plant, the National Security Cutter is designed to travel at 28 knots max speed. The cutter will include an aft launch and recovery area for two rigid-hull inflatable boats; a flight deck to accommodate a range of rotary-wing manned and unmanned aircraft and state-of-the-art command-and-control electronics.
Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

First Supramax Vessel for Japan-Italy Venture

'DACC Tirreno' was delivered at the Oshima shipyard in Japan yesterday, the first of four Supramax bulk carriers for the dACC Maritime Limited fleet, the joint

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

BAE Systems to Expand San Diego Shipyard

BAE Systems announced it will invest approximately $100 million to expand drydocking capabilities at its San Diego shipyard.   The investment, which will include

Maritime Security

Vietnam's Submarines to Counter China?

Vietnam's new submarines could alter the balance in the South China Sea quite dramatically, say maritime security analysts.   Vietnam and China have long contested

US Navy to Roll out Underwater Spy Satellites

The robotic series that remade crusade in skies will shortly extend to a low sea, with underwater view “satellites,” drone-launching pods on a sea building and unmanned ships sport submarines,

India May Add Japanese Soryu-Class Submarines to its Fleet

India is reportedly considering a project to incorporate six Japanese Soryu-class diesel-electric submarines into its fleet, says The Japan Times.   The Defense

 
 
Maritime Contracts Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1285 sec (8 req/sec)