Northrop Grumman Shipbuilding Team Honored by U.S. Coast Guard

Thursday, November 17, 2005
The U.S. Coast Guard honored a Northrop Grumman Corporation shipbuilding team for their Hurricane Katrina recovery performance on the first Deepwater National Security Cutter. Northrop Grumman's Ship Systems sector resumed shipbuilding just two weeks after Hurricane Katrina. The company is building the National Security Cutter at their Pascagoula facility, under contract from Integrated Coast Guard Systems LLP, a joint venture of Northrop Grumman and Lockheed Martin Corporation. U.S. Coast Guard Rear Adm. Patrick Stillman, program executive officer for the Integrated Deepwater System program, praised the shipbuilding team, saying, "What you have collectively experienced here with Katrina and the challenge of coming together in order to infuse your character, competency, commitment and most of all your sense of community into the decks of this ship is a legacy. It is a legacy that will take young men and women to sea and mold their character as yours has been molded in confronting the challenges that mark our existence." Stillman toured the ship with shipyard management and acknowledged the efforts of 30 shipbuilders by presenting them with Deepwater Awards for Excellence. The awards read, "We are pleased to commend you for your exemplary performance of duty while assigned to the Integrated Deepwater System program and team during the recovery and restoration efforts resulting from Hurricane Katrina." "I can't thank you enough for what you've done," Stillman said, at the end of his tour. "There is no question in my mind that this ship will sail carrying a standard of excellence that is unrivaled because of you." The National Security Cutter will be a 418-foot ship with a 4,300-ton displacement at full load. Powered by a twin-screw combined diesel-and-gas turbine-power propulsion plant, the National Security Cutter is designed to travel at 28 knots max speed. The cutter will include an aft launch and recovery area for two rigid-hull inflatable boats; a flight deck to accommodate a range of rotary-wing manned and unmanned aircraft and state-of-the-art command-and-control electronics.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Austal Delivers 7th Cape Class Patrol Boat

Shipbuilder Austal Limited announced it has delivered Cape Wessel, the seventh of eight Cape Class patrol boats being supplied to Australian Border Force under a $330 million design,

Silversea Cruises Orders Luxury Ship from Fincantieri

Shipbuilder Fincantieri has received an order to build a new luxury cruise ship for client Silversea Cruises due for delivery in April 2017.    At 40,700 grt and accommodating 596 guests,

Latest LCS Completes US Navy Trials

Littoral Combat Ship 6 (LCS 6), the future USS Jackson, has completed U.S. Navy acceptance trials, shipbuilder Austal Limited announced.   The trials, the final milestone before delivery,

Maritime Security

Latest LCS Completes US Navy Trials

Littoral Combat Ship 6 (LCS 6), the future USS Jackson, has completed U.S. Navy acceptance trials, shipbuilder Austal Limited announced.   The trials, the final milestone before delivery,

EU NAVFOR Consults Somali Fisherman

Sailors from Operation Atalanta Warship ITS Libeccio speak to local fishermen about European Union’s efforts to deter Somali piracy   Sailors from Operation Atalanta

PMSC Approved to Supply Armed Guards on French Ships

Aspida is the first PMSC to be permanently approved by CNAPS to provide armed guards onboard French flagged vessels.   Maritime security firm Aspida informs that as of June 12,

 
 
Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1238 sec (8 req/sec)