Odfjell Announces Ship Sale and Delivery

Wednesday, March 19, 2008

As part of Odfjell's continued fleet renewal process, two older ships have been sold. The company also took delivery of the 33,707 fully stainless steel newbuilding M/T Bow Heron on long term time-charter.
The parcel tanker M/T Bow Condor (27,950 dwt/built 1978) has been sold for demolition. The Bow Condor was built in and was the last vessel of the 13 ships in the B76 series to operate in our service.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

VLCC Delivered to Gener8 Maritime

Gener8 Maritime, Inc., a U.S.-based provider of international seaborne crude oil transportation services, has taken delivery of the ECO VLCC the Gener8 Constantine on June 27,

Future LCS Charleston’s Keel Authenticated

A ceremony was hosted to celebrate the keel authentication of the U.S. Navy's future USS Charleston (LCS 18), the ninth Independence variant littoral combat ship, June 28.

Hybrid RoPax Ferry Delivered to Royal TESO

Hybrid RoPax ferry Texelstroom has been delivered to Koninklijke N.V. Texels Eigen Stoomboot Onderneming (Royal TESO).   This latest generation symmetrical ferry is powered by efficient,

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1706 sec (6 req/sec)