Odfjell Announces Ship Sale and Delivery

Wednesday, March 19, 2008

As part of Odfjell's continued fleet renewal process, two older ships have been sold. The company also took delivery of the 33,707 fully stainless steel newbuilding M/T Bow Heron on long term time-charter.
The parcel tanker M/T Bow Condor (27,950 dwt/built 1978) has been sold for demolition. The Bow Condor was built in and was the last vessel of the 13 ships in the B76 series to operate in our service.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Seacor Takes Delivery of 10,800 HP Crewboat

Seacor Marine is building ever larger and more powerful mono-hull crew/supply boats. The first of these to be delivered is the 202x34-foot Alex F. McCall with some very impressive statistics.

Diana Extends Containership Time Charters

Diana Containerships Inc. announced direct continuation of time charter agreements for m/v Cap Domingo and m/v Cap Doukato   Diana Containerships Inc., a global

A Classic Repower

The tug Falcon was built by Modern Marine Inc. in 1978. In the intervening years, companies that employed her have changed hands a number of times until 2013 when Vane Line Bunkering of Baltimore,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1130 sec (9 req/sec)