Odfjell Announces Ship Sale and Delivery

Wednesday, March 19, 2008

As part of Odfjell's continued fleet renewal process, two older ships have been sold. The company also took delivery of the 33,707 fully stainless steel newbuilding M/T Bow Heron on long term time-charter.
The parcel tanker M/T Bow Condor (27,950 dwt/built 1978) has been sold for demolition. The Bow Condor was built in and was the last vessel of the 13 ships in the B76 series to operate in our service.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Navios Announces VLCC Delivery

Navios Maritime Acquisition Corporation, an owner and operator of tanker vessels, has announced that the Nave Electron, a 2002-built VLCC of 305,178 dwt, was delivered

VIDEO: HMS Queen Elizabeth Floats Out

A timelapse video of HMS Queen Elizabeth floating out of her dock for the first time is now available at http://www.youtube.com/watch?v=P0ZjQz9vEKw. The float out of the 65,

COSCO Corpn. Secures Contracts of $300 mi

COSCO Corporation (Singapore) Limited announced that shipyards, which are subsidiaries of the Company’s 51% owned subsidiary COSCO Shipyard Group Ltd, have secured

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2846 sec (4 req/sec)