Panama Canal Extends Deadline for Locks Design-Build Bid Submission

Tuesday, July 22, 2008

The Panama Canal Authority (ACP) extended the locks proposal due date. The four global consortia in the running for the contract will now have until December 10 to submit their bids for what will be the largest and most important project under the $5.25 billion expansion. The ACP received requests from the consortia to extend the proposal due date and has listened to their needs. Additional time given to the consortia will result in more fully developed bids on both the technical and price proposals, ultimately benefitting the expansion project. This extension is in line with the overall timeline of the expansion project and the program remains on track. The ACP has already planned for such contingencies and other similar scenarios.


News

MV WERFTEN, Foreship Sign Design Agreements

MV WERFTEN signed a letter of intent with the engineering company Foreship in Stralsund today. The agreement includes parts of the basic design as well as design,

Rockland Scientific to conduct Victoria Turbulence Observation Retreat

Building on series of international training workshops in Brazil, Chile, France, Poland, Vietnam and the UK, Rockland Scientific brings the next turbulence measurement

NParks, Keppel in S$2.08 mln Partnership for Restoring Singapore Forest Wetlands

The National Parks Board (NParks) and Keppel Corporation today unveiled plans for a partnership to restore the freshwater forest wetland ecosystem historically

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0678 sec (15 req/sec)