Panama Canal Locks Undergo Overhaul

Tuesday, August 22, 2006
Panama Canal Authority work crews conduct a scheduled maintenance and overhaul at Gatún Locks, located at the Atlantic Ocean entrance to the Canal.

The Panama Canal Authority (ACP) recently undertook scheduled maintenance work in four of the lock gates of the west chamber in the Gatún Locks. The work, which began on Tuesday, August 15, was completed Sunday, August 20, and required draining the locks chamber. The lock gates and valves also underwent a system of corrosion protection.

Each set of locks is named after the town in which it was constructed: Gatún (on the Atlantic side), Pedro Miguel and Miraflores (on the Pacific).

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

AEU Presents Safety Awards

The American Equity Underwriters, Inc. (AEU) presented its 2014 Safety Awards at the annual American Longshore Mutual Association, Ltd. (ALMA) Conference on July 19, 2015, in Key Biscayne, Fla.

Hapag-Lloyd Names Haeser Next CCO

Container shipping line Hapag-Lloyd AG’s supervisory board has appointed Thorsten Haeser as a new executive board member in charge of Hapag-Lloyd’s global sales

MARAD to Host Meeting on Proposed Delfin LNG License

MARAD Announces Public Scoping Meetings for Proposed Delfin Liquefied Natural Gas Deepwater Port Export Facility.   On July 29, the Maritime Administration

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2742 sec (4 req/sec)