Panama Canal Locks Undergo Overhaul

Tuesday, August 22, 2006
Panama Canal Authority work crews conduct a scheduled maintenance and overhaul at Gatún Locks, located at the Atlantic Ocean entrance to the Canal.

The Panama Canal Authority (ACP) recently undertook scheduled maintenance work in four of the lock gates of the west chamber in the Gatún Locks. The work, which began on Tuesday, August 15, was completed Sunday, August 20, and required draining the locks chamber. The lock gates and valves also underwent a system of corrosion protection.

Each set of locks is named after the town in which it was constructed: Gatún (on the Atlantic side), Pedro Miguel and Miraflores (on the Pacific).

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

W&O, LESER Partner to Deliver Safety Relief Valves

W&O, a global supplier to the marine and upstream oil and gas markets for pipe, valves and fittings, valve automation and engineered solutions, has partnered with

Fednav Celebrates Anniversary Trio in Cleveland

Fednav Limited held a reception on board one of its vessels, the Federal Mayumi, at the Port of Cleveland yesterday to celebrate a trio of anniversaries: the 70th

Karl Senner Inks Distribution Deal with Electronic Power Design

Karl Senner, LLC (KS) has reached a new strategic representation agreement with Electronic Power Design (EPD). Karl Senner, LLC now represents EPD in the United States marine and offshore Markets.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pipelines Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1415 sec (7 req/sec)