Panama Canal Locks Undergo Overhaul

Tuesday, August 22, 2006
Panama Canal Authority work crews conduct a scheduled maintenance and overhaul at Gatún Locks, located at the Atlantic Ocean entrance to the Canal.

The Panama Canal Authority (ACP) recently undertook scheduled maintenance work in four of the lock gates of the west chamber in the Gatún Locks. The work, which began on Tuesday, August 15, was completed Sunday, August 20, and required draining the locks chamber. The lock gates and valves also underwent a system of corrosion protection.

Each set of locks is named after the town in which it was constructed: Gatún (on the Atlantic side), Pedro Miguel and Miraflores (on the Pacific).


People & Company News

MN100: MarineCFO

The Company: Founded in 1992, UA Business Solutions was a pioneer in the field of Enterprise Resource Planning (ERP) and an early Microsoft Partner. The ERP evolution

MN100: All American Marine, Inc.

The Company: All American Marine Inc. was founded in 1987 and specializes in the construction of custom tailored aluminum boats from 30 to 150 feet LOA. Today,

Five Minutes with Paul Switzer

Five minutes with Paul Switzer - Manager, Shipbuilding & Offshore, Viega   For readers not familiar with Viega, please give a ‘birds eye’ view, putting the company

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1258 sec (8 req/sec)