Panama Canal Locks Undergo Overhaul

Tuesday, August 22, 2006
Panama Canal Authority work crews conduct a scheduled maintenance and overhaul at Gatún Locks, located at the Atlantic Ocean entrance to the Canal.

The Panama Canal Authority (ACP) recently undertook scheduled maintenance work in four of the lock gates of the west chamber in the Gatún Locks. The work, which began on Tuesday, August 15, was completed Sunday, August 20, and required draining the locks chamber. The lock gates and valves also underwent a system of corrosion protection.

Each set of locks is named after the town in which it was constructed: Gatún (on the Atlantic side), Pedro Miguel and Miraflores (on the Pacific).

Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Children’s Day at Gazprom Transgaz Saratov

On May 31 and June 1, 2014 . Over two thousand children from the Saratov, Tambov and Penza Regions took part in sports competitions, environmental quizzes and

Rolls-Royce Appoints Ruth Cairnie as Non-Executive Director

Rolls-Royce is pleased to announce that Ruth Cairnie has been appointed as a Non-Executive Director of the Company with effect from 1 September 2014. Ruth

Geo-Science Provider TGS Reports Strong Half 2014 Results

TGS reports net revenues of USD 205 million in Q2 2014, compared to USD 210 million in Q2 2013. Earnings before interest and taxes (EBIT) totaled USD 82 million,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 4.6874 sec (0 req/sec)