Runaway Rig Closes Two Norwegian Fields

Wednesday, June 14, 2000
Two Norwegian oilfields were shut Wednesday amid fears that a stricken exploration rig might start dragging its anchors in high seas and threaten to crash into them. The North Sea Snorre and Vigdis fields, with a combined output of 260,000 bpd, closed after three of the rig's eight anchors broke free of the seabed in a storm which produced 55 ft. waves. About two-thirds of the rig workers were evacuated via helicopter, and no injuries were reported. According to the company, it is still too early to indicate what the Bideford Dolphin incident would cost. The rig, which was recently upgraded at Harland and Wolff, is owned by Fred Olsen Energy and is on lease to Hydro for oil exploration drilling.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

Statoil: New Oil in the Grane Area

Statoil has together with PL169 partners proved new oil resources in the D-structure in the vicinity of the Grane field in the North Sea.   Well 25/8-18 S, drilled by the rig Transocean Leader,

Offshore Oil: Lamprell Completes Caspian Sea Drilling Unit

UAE-based Lamprell said that it completed construction of the second Caspian Sea jackup drilling rig, Mercury, for service in the Caspian Sea.   "I am delighted

Tanker Trends

Weak Oil Threatens US Export of LNG

Plunging global oil prices may turn hopes for cheap liquefied natural gas supplies from the United States into a costly disappointment for Asian buyers who have

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1437 sec (7 req/sec)