ST Engg to Acquire FGH Shipbuilding Facilities

Wednesday, July 24, 2002
Singapore Technologies Engineering Ltd (ST Engg), through its U.S. arm, Vision Technologies Kinetics Inc (VT Kinetics), has made a successful bid for the assets of Halter Marine, the shipbuilding arm of US-based Friede Goldman Halter Inc (FGH). The acquisition will include seven of FGH's shipbuilding facilities located in Louisiana and the Mississippi Gulf Coast. The proposed purchase consideration for FGH's shipbuilding facilities amounts to $66 million. The final award of the bid will be subjected to the approval of the Bankruptcy Court in Mississippi and other regulatory approvals. Final approvals by these authorities are expected to be made known by end August 2002.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

HMS Prince of Wales Delivery Begins

A huge section of hull for HMS Prince of Wales, the second aircraft carrier being delivered to the Royal Navy, has today departed BAE Systems in Glasgow on a 600-mile

Gondan to Build Spanish Patrol Boats

Gondan Shipyard has recently signed a contract with the Guardia Civil, Spain’s Civil Guard, for the building of two patrol boats. The aluminum and fiber (PRFV ) vessels will measure 20.

ABS to Class the World's First CNG Ship

ABS announced it has been chosen to class the world's first compressed natural gas (CNG) carrier ordered by Pelayaran Bahtera Adhiguna, a subsidiary of Indonesia's

Casualties

Tripoli Airport Ablaze, Rockets Leave Libya in Chaos

Diplomats flee Libyan chaos; Politicians appeal for international intervention. Clashes in Tripoli, Benghazi kill around 160 over two weeks, while Libyan capital face fuel, power shortages.

South Korean Teens: Left to Escape Sinking Ferry

Students testify no help came from crew; Coastguard rescuers were passive, only pulling passengers out. Crew in a state of panic, witness says. Six teenagers

Coast Guard Responds to Grounded Freighter in Lake St. Clair

The Coast Guard has responded Sunday to a 656-foot freighter that was hard aground in the downbound shipping channel of Lake St. Clair. Initial reports indicate

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1230 sec (8 req/sec)