Submarine Power Cable Repair Project

Wednesday, March 02, 2005
The Minerals Management Service (MMS) issued a Notice stating that it has prepared an environmental assessment and finding of no significant impact for the planned repair project on the submarine power cable that links an offshore platform with the shore in Santa Barbara County. 70 Fed. Reg. 10111 (HK Law)
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

ONR Funds UW Oceanographic R/V Refit Contract

The US Department of Defense informs that the University of Washington (UW), Seattle, Washington, is being awarded a $12,776,050 cost reimbursement contract for

Navy, Other Agencies, Award Bio-refinery Contracts to 3 Firms

As part of a 2011 Presidential directive, the Departments of Navy, Energy, and Agriculture have announced that three companies have been awarded contracts to construct

David Palacios is Director of Quality, Environment & Safety, SENER

The engineering and technology group SENER has brought together its Quality, Environment and Safety divisions into one unified Department. The move aims to reorganize

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Port Authority Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 4.6957 sec (0 req/sec)