Technip to Build New Pipelay Vessel

Tuesday, October 16, 2007
Technip awarded STX Heavy Industries (Korea) a contract for the construction of its new pipelay vessel. This 194m-long vessel will have twin 2,800 ton reels. She will have a top tension capacity of 450 tons for laying rigid steel pipes and flexible products up to 18-in. in diameter through a dedicated lay tower installed at the stern. She will also be equipped with a 150 ton crane, a PLET (pipeline end terminations) handling system and accommodation for 140 people. With a transit speed of 20 knots, she has been specifically designed to minimize intercontinental transits and allow her efficient deployment in all deep water regions of the world. The contract covers detailed design, construction, outfitting and commissioning of all marine aspects, including the installation of all underdeck pipelay equipment. The remainder of the pipelay system will be installed and commissioned at a later date at the pipelay supplier’s facilities. The project will be managed by a dedicated team from Technip's operating center in Aberdeen (Scotland). The new vessel is scheduled for delivery in 2010. “This major investment in a state-of-the-art vessel is part of our fleet development strategy. It will strengthen the Group’s presence on the high-growth Subsea arket and respond to a demand which is evolving towards developments requiring high technological added-value at increasing water depths”, stated Thierry Pilenko, Technip’s Chairman and CEO.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Fincantieri Invests In Camper & Nicholsons

Fincantieri has signed an agreement for the acquisition of a minority stake via capital injection in Camper & Nicholsons International (Camper & Nicholsons), the

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1282 sec (8 req/sec)