UAF Arctic Research Vessel to be Built

Thursday, December 10, 2009
Image courtesy of the University of Alaska Fairbanks

More than three decades ago, marine scientists in the United States first identified the need for a research vessel capable of bringing scientists to Alaska’s icy northern waters. The University of Alaska Fairbanks has announced its intent to award a $123m contract that will meet that need. The university has selected Marinette Marine Corporation of Marinette, Wis. to build the 254-ft Alaska Region Research Vessel.

When complete, the vessel will be one of the most advanced university research vessels in the world and will be capable of breaking ice up to 2.5 feet thick. According to project leaders, the ARRV’s home port will be in Alaska, most likely at UAF’s Seward Marine Center.

“Ocean scientists need this ice-capable vessel now, more than ever before, to study the changes occurring in arctic waters,” said Denis Wiesenburg, a co-principal investigator on the project and the dean of the UAF School of Fisheries and Ocean Sciences.

The $123m for the ship construction contract is funded entirely by the American Recovery and Reinvestment Act.  The total cost for the project is $200m.

“In the short term, constructing this world-class research vessel will create American jobs to help our nation pull out of the current recession,” said Sen. Mark Begich. “The University of Alaska has dreamed of having a new research vessel for decades and I am thrilled to see work will soon get underway through the American Recovery and Reinvestment Act. Once complete, the ARRV will be a state-of-the-art platform to conduct the scientific research necessary for Alaskans to understand the challenges we’re feeling from climate change and its implications on the changing arctic environment.”

The vessel will be owned by the National Science Foundation and operated by UAF as part of the U.S. academic research fleet. It will be used by scientists in the U.S. and international oceanographic community through the University-National Oceanographic Laboratory System. The vessel was designed by The Glosten Associates, a marine architecture firm in Seattle.

After the ship has been completed, the crew will take the vessel from the shipyard through the Great Lakes-St. Lawrence Seaway transit system and the Panama Canal to Alaska in 2013. While in transit, scientists and crewmembers will test the scientific components of the ship in preparation for unrestricted science operations beginning in 2014.

In addition to its ice-breaking capabilities, the ARRV will allow researchers to collect sediment samples directly from the seafloor, host remotely operated vehicles, use a flexible suite of winches to raise and lower scientific equipment, and conduct surveys throughout the water column and sea bottom using an extensive set of research instrumentation.

The ship will be able to transmit real-time information directly to classrooms all over the world. The vessel design strives to have the lowest possible environmental impact, including a low underwater-radiated noise signature for marine mammal and fisheries work. The ARRV will have accommodations for up to 26 scientists and students at a time, including those with disabilities.
 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

China Shipyards Bag the Week's Ocean-going Newbuild Orders

Reported ordering this week has been exclusively focussed on the Chinese yards, says Clarkson Hellas in their latest 'S&P Weekly Bulletin'. Dry bulk carriers COSCO

Aker Philadelphia Shipyard ASA: Purchase of own shares

Aker Philadelphia Shipyard AKPS), a leading U.S. commercial shipyard constructing vessels for operation in the Jones Act market, has on July 25, 2014 purchased 1,

HMS Prince of Wales Delivery Begins

A huge section of hull for HMS Prince of Wales, the second aircraft carrier being delivered to the Royal Navy, has today departed BAE Systems in Glasgow on a 600-mile

Education/Training

Webb Institute Ranked a Best Value College

Webb Institute, an undergraduate institute specializing in Naval Architecture and Marine Engineering, ranked number two on Money magazine’s list of Money's Best Colleges,

HydroComp to Hold Propeller 'Mini-Workshop'

A special version of HydroComp's intensive Propeller Workshops will be brought to Tampa before the start of IBEX 2014.   The Mini-Workshop is a special version

USCG Leadership Development Center Change of Command

The Coast Guard’s Leadership Develop Center will have its first change of command ceremony Thursday, July 31 at 11 a.m. in front of Yeaton Hall at the U.S. Coast Guard Academy in New London, Conn.

Vessels

U.S. Marshalls Ordered to Seize Kurdish Oil Cargo off Texas

Acting on a request from the central government in Iraq, a U.S. judge has signed an order telling the U.S. Marshals Service to seize a cargo of oil from Iraqi Kurdistan

Aker Philadelphia Shipyard ASA: Purchase of own shares

Aker Philadelphia Shipyard AKPS), a leading U.S. commercial shipyard constructing vessels for operation in the Jones Act market, has on July 25, 2014 purchased 1,

Danaos Corporation 2Q and 1H 2014 Results

Danaos Corporation ("Danaos") (NYSE: DAC), a leading international owner of containerships, today reported unaudited results for the period ended June 30, 2014.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1265 sec (8 req/sec)