USCG Issues Fire Protection Equipment Requirements

Monday, November 15, 1999
All towing vessels except those in restricted services are required to comply with new requirements for fire protection equipment and procedures under an interim rule issued by the USCG. The rule is the first step in a two-pronged approach to implementing the requirements of the 1996 USCG Authorization Act, which directed the USCG to promulgate regulations requiring fire suppression systems or other measures to control fires on towing vessels. The rule requires existing towing vessels, except those used solely for fleeting, pollution response or other restricted service, be equipped with the following, by October 8, 2001: · A general alarm or alternative, such as a public address system, which is tested weekly; · An engine room fire detection system with visible and audible alarms. The system must be certified by a registered Public Engineer or recognized classification society as meeting the requirements of the interim rule; · A fixed or portable system allowing for two-way communication between the pilothouse and the engine room. Twin screw towing vessels with pilothouse controls for both engines are not subject to this requirement; and, · A remote fuel shutoff for the main engine and other fuel lines. Effective January 19, 2000, the rule requires monthly firefighting drills and instruction for towing vessel crewmembers. New crewmembers who have not received the required instruction or participated in a drill, must be given a safety orientation before the vessel gets underway. New towing vessels (contracted for after January 20, 2000) must comply with the same equipment requirements as existing towing vessels before they are placed into service. New towing vessels must also comply with additional requirements regarding fuel piping, vent piping and prohibitions on the use of portable fuel tanks and alternative fuels. The interim rule does not address requirements for fixed fire suppression systems or alternatives such as semi-portable fire extinguishers and other manual firefighting equipment. These will be the subject of a supplemental notice of proposed rulemaking (SNPRM) to be published in early 2000. The USCG will accept comments on the interim rule until December 20.
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Hiab Switches to Dealer-based Distribution in Mexico

Hiab, part of Cargotec, and Consorcio Industrial Puebla S.A.P.I. de C.V. (CIPSA) have signed an agreement regarding a long-term distribution partnership in the Americas region.

Philippines to Buy Naval Assets, China Sea Dispute Simmers

The Philippines aims to buy two frigates, two helicopters and three gunboats for deployment in the South China Sea where a territorial dispute with China has lent

Maersk: Rate Hike Under Pressure on Low Demand

Container shipping firm Maersk Line said a fresh attempt made on Monday to raise freight rates on main routes from ports in Asia to those in northern Europe was

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0971 sec (10 req/sec)