VT Secures Major Share

Thursday, July 20, 2000
Vosper Thornycroft (VT) is scheduled to play a significant role in the design and construction of the initial batch of Type 45 destroyers for the Royal Navy.

VT will share in the design and production of the first three ships as well as the assembly of the second ship, which will be named HMS Dauntless. The company is currently working with the prime contractor BAE Systems on the design of the new class. Production work will commence in early 2002, with the second ship, to be assembled by VT, delivered to the Royal Navy in 2009.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Rosneft says Exxon Still Continues to Work With it in Arctic

Russia's biggest oil producer Rosneft said on Saturday that Exxon Mobil was still continuing exploration drilling at their joint project in the Arctic Kara Sea.

ICC Conference Focuses on Platform to Settle Disputes

The 5th ICC International Commercial Mediation Conference has brought together leading mediators, arbitrators, corporate managers and in-house counsel from around

Keystone XL Costs to Nearly Double - TransCanada

The total cost of TransCanada Corp's controversial Keystone XL pipeline is likely to nearly double following six years of regulatory delays, a company spokesman said on Friday.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1021 sec (10 req/sec)