Z-Drive on the Ohio

Monday, October 06, 2008

Delivered from Steiner Shipyard in Bayou LaBatre on September 29, the first of Southern Towing's Cummins-powered Z-drive tugs is now pushing barges on the inland waterways. Photographer Jeff L. Yates has provided Cummins Marine with the attached shot of the Frank T. Stegbauer on the Ohio River at on September 30, 2008. According to the company newsletter several wheelmen have already gone for Z-drive training.

At 120 x 34 ft., this is a mid-size inland waterway towboat. The vessel has a pair of HRP model 6111WM Z-drives coupled to a pair of Cummins’ new 1600 hp Tier 2 QSK50 engines that are mounted on the main deck level. This design is designed to give the vessel maneuverability while negating the need for steering or flanking rudders. All of the vessel’s controls, including the steering, are electrical eliminating the potential for hydraulic spills.

The nozzled propellers will give added bollard pull and steering power. To help with the additional torque that the towboat can apply in turning the barge, four deck winches will be installed rather than the usual two. With nearly the whole hull available for tankage the boat will carry in the 10.6-foot molded depth of the double hull 69,500 gallons of fuel, 13,000 gallons of water, 1100 gallons each of slop oil, lube oil and hydraulic oil. The 15-ton HRP z-drive units will be installed through soft patches in the hull’s deck facilitating removal without the use of a dry-dock.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

 
 
Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2047 sec (5 req/sec)