Bollinger Deliver Fifth Fast Response Cutter

Press Release
Monday, March 25, 2013
FRC 'Margaret Norvell': Photo credit Bollinger Shipyards

Bollinger Shipyards has delivered the 'Margaret Norvell', the fifth Fast Response Cutter (FRC) to the United States Coast Guard.


The 154 foot patrol craft 'Margaret Norvell' is the fifth vessel in the Coast Guard's Sentinel-class FRC program. To build the FRC, Bollinger Shipyards used a proven, in-service parent craft design based on the Damen Stan Patrol Boat 4708. 

It has a flank speed of 28 knots, state of the art command, control, communications and computer technology, and a stern launch system for the vessels 26 foot cutter boat. 

The FRC has been described as an operational “game changer,” by senior Coast Guard officials.

The Coast Guard took delivery March 21, 2013 in Key West, Florida and is scheduled to commission the vessel in New Orleans, Louisiana in June, 2013.

Each FRC is named for an enlisted Coast Guard hero who distinguished him or herself in the line of duty. This vessel is named after Coast Guard Hero, Margaret Norvell for serving admirably for 41 years with the U.S. Lighthouse Service in Louisiana from 1891 to 1932.  Her devotion to duty saved the lives of countless sailors as she vigilantly stood the watch. Norvell served as keeper of both the Port Ponchartrain Light and the West End Light.

The announcement was made by Bollinger executive vice president of new construction, Chris Bollinger, “We are very pleased to announce another successful on-time delivery to the Coast Guard.  The Margaret Norvell was delivered to the 7th Coast Guard District in Key West, FL, and will be stationed at USCG Sector Miami.  We are all looking forward to the vessel’s commissioning, as well as honoring and celebrating the heroic acts of Margaret Norvell.”
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Bollinger Wins Contract for Phase II FRC Builds

Louisiana shipbuilder Bollinger Shipyards announced it has secured a contract to build Phase II of the Sentinel Class Fast Response Cutters (FRC) for the United States Coast Guard (USCG).

Massive Layoff Ahead for Hyundai Heavy

Another massive reduction in the Korean shipbuilding workforce may come as most shipyards are still struggling with falling orders and mounting losses, reports Yonhap quoting industry sources.

Daewoo Shipyard Posts Q1 Operating Loss

South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering Co. posted a first-quarter loss after incurring more costs to finish some offshore projects.   First-quarter

Coast Guard

GPA Will Continue Weighing Containers at No Cost to Shippers

The U.S. Coast Guard announced last week that state-calibrated scales already in use at the Port of Savannah meet a new requirement of the international Safety of Life at Sea (SOLAS) Convention.

Great Lakes Shipyard Performs USCG Drydocking

On April 25, Great Lakes Shipyard hauled out the U.S. Coast Guard’s 125’ x 52’ Aids to Navigation Barge (12001). Using the Shipyard’s 770-ton Marine Travelift,

Bollinger Wins Contract for Phase II FRC Builds

Louisiana shipbuilder Bollinger Shipyards announced it has secured a contract to build Phase II of the Sentinel Class Fast Response Cutters (FRC) for the United States Coast Guard (USCG).

 
 
Maritime Security Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0820 sec (12 req/sec)