Draka Marine Cable Order for Royal Boskalis

Friday, January 14, 2011

Draka Offshore announced that Keppel Singmarine has selected Draka as a cable supplier for its production of Hull 362 for Royal Boskalis Westminster. The contract requires Draka to deliver the first batch of cable during first quarter 2011 which is being manufactured at the company's Asian marine cable manufacturing facility located in Suzhou, China.

Royal Boskalis Westminster awarded Keppel Singmarine with the contract to construct a 522-ft long rock dumping fallpipe vessel first quarter 2010. The vessel will have a 24,000 ton carrying capacity, features propulsion machinery, special rock handling equipment, and a flexible fall pipe with an ROV for positioning.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Meyer Turku Wins TUI Cruises Order for 2 Ships

TUI Cruises GmbH and Meyer Turku Oy signed an agreement for two cruise ships. This order further strengthens the order book of the shipyard, which contains now a high work load until the year 2020.

Oranjewerf Ship Repair becomes Damen Shiprepair Oranjewerf

On 1 July 2015, Oranjewerf Ship Repair, which joined Damen Shipyards Group in 1989, will officially change its name to Damen Shiprepair Oranjewerf. This name

Shell Steps Closer to Arctic Drilling

The U.S. Fish and Wildlife Service authorized the nonlethal, incidental, and unintentional take of small numbers of polar bears and Pacific walrus that result

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1342 sec (7 req/sec)