Nichols Brothers to Build Arctic Landing Craft

MarineLink.com
Thursday, November 07, 2013
Photo: Nichols Brothers Boat Builders

Bowhead Transport, LLC has recently awarded Nichols Brothers Boat Builders a contract to construct a new 150 by 50’ Landing Craft. The landing craft will operate in Arctic coastal villages of the North Slope Borough of Alaska and between the Pacific and Arctic oceans.

The vessel designed by Columbia Sentinel Engineering, Inc. will consist of a steel hull, including the main deck; with an aluminum deck house and pilot house. The vessel will be powered by three diesel engines; Caterpillar C-18 DITA Commercial EPA Tier 3, rated 600 hp at 1,800 rpm, Keel cooled, remote mount Twin Disc MGX5170 reduction gears.

Nichols Brothers will start construction immediately, and delivery is scheduled to take place summer 2014.

nicholsboats.com
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ClassNK's Noboru Ueda Attends KOTC Delivery Ceremony

Mr. Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

News

USCG, National Park Service Rescue Sea Turtle

Members from the U.S. Coast Guard and National Park Service rescued a loggerhead sea turtle Sunday in Oregon Inlet. Watchstanders at Coast Guard Sector North Carolina

Bulk Equipment is Delivered to Syzran Refinery

A reactor and a cold high-pressure separator is delivered to the site of Rosneft subsidiary Syzran Refinery for the constructed diesel hydro-treater. The unit

Achinsk Refinery Resumes Operation on Tight Schedule

Achinsk Oil refinery, suspended after the incident of June 15, 2014 has recovered the processes of primary crude oil processing on a tight schedule, according to the plan of repair activities.

Arctic Operations

Too Eager to Drill for Arctic Oil - Greenpeace

Greenpeace's ship, the Esperanza, is still on station in the Arctic to expose renewed Norwegian efforts to drill for oil in this pristine environment. Last

Rosneft Restores Meteorological Observations System in Kara Sea

As part of a large-scale summer Arctic research expedition "Kara-Summer - 2014" a meteorological station was installed that meets the latest modern requirements for such equipment,

Warming Aids Arctic Economies, but Short of 'Cold Rush'

Climate change is aiding shipping, fisheries and tourism in the Arctic but the economic gains fall short of a "cold rush" for an icy region where temperatures are

 
 
Maritime Contracts Maritime Standards Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1898 sec (5 req/sec)