Harvey Gulf Taps Carroll to Oversee New Construction

press release
Friday, February 15, 2013
Mike Carroll, Sr. Vice President of New Construction and Special Projects.

New Orleans headquartered Harvey Gulf International Marine, LLC is pleased to announce that Mike Carroll will be joining the organization in March in the position of Sr. Vice President of New Construction and Special Projects based in Houston, Texas.

 

Mr. Carroll has over 15 years of experience in the field of Naval Architecture and ship construction. Mr. Carroll will be responsible for overseeing Harvey Gulf’s new construction programs. In another development, Harvey Gulf also announced today that it has secured plans to build two U.S Flag, Jones-act compliant offshore construction vessels. The vessels will be 328ft (100.m) and 360ft (110m) in length overall. Both vessels will be diesel electric and equipped with 250T AHC knuckle-boom sub-sea cranes, work-class ROVs, and in excess of 100 persons on board suitable for both domestic and international deepwater operations.


Currently, Harvey Gulf is set for delivery of their first construction vessel, the STX CV310 from Eastern Shipbuilding Group in Panama City, Florida. The 310ft (94.5m) vessel when completed will have a 165T AHC knuckle-boom subsea crane capable of 100T of cargo at 10,000ft of water depth.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Symphony Sun’ Launched in Leer

On Friday the 29th of April, Nb. 420 was launched in Leer. She was christened ‘Symphony Sun’ and is the fourth vessel in a series of 6 that will be delivered to Symphony Shipping.

SCHOTTEL Debuts EcoPeller with High-torque Gears

Propulsion and steering systems manufacturer SCHOTTEL has unveiled its new EcoPeller (SRE), which it said offers improved efficiency and robustness. Playing a

Fincantieri Delivers Carnival Vista

Carnival Vista, the new flagship of the fleet of Carnival Cruise Line, brand of the Carnival Group, was delivered today at Fincantieri’s shipyard in Monfalcone.

Ship Repair & Conversion

Conquest Installs 850t Crane on Allseas Solitaire

Conquest Offshore was contracted by Allseas to remove a 300-ton crane and transport and install a 850-ton Huisman crane on board of one of the largest pipe-lay vessels in the world, Allseas Solitaire.

Canadian Navy Frigate Refit Program Completed

Seaspan joined Harjit S. Sajjan, Canada’s Minister of National Defense, at an official ceremony today to celebrate the completion of the Halifax-Class Modernization/Frigate

How France Sank Japan's Sub Dream

Ousting of Japan ally PM Abbott opened door to rivals; Tokyo slow to respond to new competitive process. In 2014, a blossoming friendship between Australian

Ship Sales

How France Sank Japan's Sub Dream

Ousting of Japan ally PM Abbott opened door to rivals; Tokyo slow to respond to new competitive process. In 2014, a blossoming friendship between Australian

Samsung Heavy Loses $4.6-bln FLNG Order

South Korea’s shipbuilder Samsung Heavy Industries (SHI), the world’s third-largest shipbuilder,  has received a contract termination for three floating liquefied

Japan wants Australian Explaination for Failed Sub Bid

Japan wants Australia to explain why it decided not to pick a Japanese design for a new fleet of submarines choosing instead a proposal from France's DCNS. "The decision was deeply regrettable,

Naval Architecture

Symphony Sun’ Launched in Leer

On Friday the 29th of April, Nb. 420 was launched in Leer. She was christened ‘Symphony Sun’ and is the fourth vessel in a series of 6 that will be delivered to Symphony Shipping.

New Tank Barge Delivered to Harley Marine

The newly built tank barge, the Fight A.L.S., was delivered to Harley Marine Services on February 19, 2016.   Designed by Elliott Bay Design Group (EBDG) and constructed at Vigor Fab in Portland,

Oregon State Seeks Shipyard Input for New Research Ship

Oregon State University to issue RFI on ship project after design completion   The design phase for a project to construct a new regional class research vessel

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0927 sec (11 req/sec)