Wärtsilä to Design Heavy Construction Vessel for Subsea 7

MarineLink.com
Thursday, June 06, 2013
Photo: Wärtsilä

Wärtsilä, a marine industry solutions and services provider, has been contracted to provide the design for a large heavy construction vessel (HCV). The ship is to be built for Subsea 7 S.A., the seabed-to-surface engineering, construction, and services contractor to the offshore energy industry worldwide, by Hyundai Heavy Industries (HHI) in South Korea. HHI is one of the world's largest ship building companies.

Wärtsilä Ship Design's VS 4285 HCV design will be one of most capable heavy construction vessels in Subsea 7's fleet of over 40 ships, the company claims. The vessel will be deployed globally to meet increasing market demands for executing ever larger and more complex projects. It is designed for operating efficiently in deep and ultra deep waters and in harsher environments. 

The new HCV will be capable of operating on a year round basis. In finalizing the design, close cooperation between Hyundai Heavy Industries as builder, Huisman for the crane and vertical laying system, and MAATS as supplier of the carousel, was essential in meeting the requirements set by Subsea 7. 

According to Wärtsilä, important features of the design include dynamic positioning (DP) capabilities, as well as an efficient hull form. 

VS 4285 HCV

Length: 160 m
Breadth: 32 m
Depth: 13.5 m
Service speed: 15 knots
Under deck Carousel: 7000MT
VLS: 325 t tension
Deck area: approx. 2600 m
Crane: 600T
Accommodation: 132 POB R
ROV: two x WROV

www.wartsila.com
 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Naval Architecture

3D Machining Puts Wind in the Sails

With ESPRIT CAM software, Armor Mécanique has the wind in its sails; 50% time savings, better quality and new markets thanks to 3D machining Established in 1984

Changes in Aker Solutions' Top Deck

Tore Sjursen will assume the position as executive vice president for operational improvement and risk management at Aker Solutions on April 1. Knut Sandvik

Wärtsilä's' New Plant in Brazil

Following an investment of 20 million euros, Wärtsilä's' new unit will produce and test motor generators and thrusters   Wärtsilä's first unit at Porto do Açu in São João da Barra (RJ),

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Offshore Energy

Nations Convene for Arctic Maritime Discussion

Citing an increasing need to ensure safety, security and stewardship of Arctic waters, member countries of the Arctic Council gathered at U.S. Coast Guard Headquarters

Advanced Drillships a Burden for Owners as Business Slows

Not so long ago, advanced drillships costing more than half a billion dollars each and capable of operating in ever-deeper waters practically guaranteed big profits for oil-rig operators.

Russia May Allow More Firms to Offshore Oil

Russia may allow more oil companies to access its offshore projects, Energy Minister Alexander Novak said on Friday.   "In general, the access can be extended," Novak told reporters in Moscow.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1283 sec (8 req/sec)