Helix Awards Huisman Contract

Marinelink.com
Wednesday, October 09, 2013

Huisman won a new contract from Helix Energy Solutions Group, Inc. for the delivery of a Well Intervention System onboard Helix’s new build Semi submersible “Q7000”. The system, which is based on Huisman’s proven Multi Purpose Tower (MPT) design, will be built by the Huisman production facility in China.
     


The fully integrated 800mt Well Intervention System will be capable of handling the Intervention stack, the high pressure riser and other components. The Huisman Multi Purpose Tower has the same functionality as a normal derrick but offers improved accessibility to the well center, which allows for new improved handling procedures that increase efficiency and safety. The superior accessibility to the well center and the small footprint of the MPT are ideally suited for well intervention and subsea installation services. Subsea equipment can be skidded into the well center from three sides, offering enhanced flexibility.
 


The active heave compensation hoist system of the MPT provides excellent means for safe landing of equipment at the seabed while the passive heave compensation system provides a safe and redundant means to supply top tension to the risers. A guide trolley, travelling the entire length of the tower, guides the subsea modules during lifting operations. The system also features multiple transfer hatches that can be used to move equipment into the well center, and a skiddable work floor covering the moonpool flush with main deck.



The skiddable work floor allows large subsea modules to be deployed, without the need for a raised work floor. When large objects need to pass the moonpool the work floor can be skidded aside. In closed position, the work floor is flush with the main deck, which significantly reduces HSE risks and improves equipment handling on deck.



In addition to the Well Intervention System Huisman will also supply a 150mt Knuckle Boom Crane and a 160mt Pedestal Mounted Crane. Previous orders from Helix, amongst others, the Multi Purpose Tower onboard the “Q4000”, “Well Enhancer” as well as the cranes for the “Q4000” and “Q5000”.

 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Kemp Succeeds Semple at Wood Group

Wood Group announced following changes to its senior management team. Alan Semple, chief financial officer (CFO) has advised the board that he intends to

ST Engineering Rejigs Top Deck

Singapore Technologies Engineering Ltd (ST Engineering) today announced the appointment of senior management personnel to new key management positions in the

Contracts

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

News

USCG Assist Duck Hunters Near Harrington Beach Park

The Coast Guard and the Port Washington and Cedar Grove Fire Departments came to the assistance of two duck hunters on Lake Michigan Friday. The names of those involved are not being released.

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Kemp Succeeds Semple at Wood Group

Wood Group announced following changes to its senior management team. Alan Semple, chief financial officer (CFO) has advised the board that he intends to

Marine Equipment

ST Engineering Rejigs Top Deck

Singapore Technologies Engineering Ltd (ST Engineering) today announced the appointment of senior management personnel to new key management positions in the

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Sea Star Line: Equipment Replacement Plan on Track

Company Receives New Refrigerated Containers and Places Order for New Genset Equipment   Sea Star Line, LLC began receiving the first of its new 100 40’ and 45’

Underwater Engineering

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

EMGS to Map Brazil's Gas Hydrates

Electromagnetic Geoservices ASA (EMGS) has received a contract worth USD 1.5 million for a research project in Brazil. The project will use 3D EM data to map

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3541 sec (3 req/sec)