Aker and Statoil Cancel Cat B Contract

MarineLink.com
Monday, June 24, 2013

Aker Solutions ASA and Statoil ASA have cancelled a contract for delivery of a semi-submersible rig capable of year-round well-intervention services on the Norwegian continental shelf.

The companies in April 2012 agreed Aker Solutions would build the Category B (Cat B) rig and use it to provide Statoil with a range of well-intervention and drilling services for an initial eight years, starting in 2015. The technology development needed to build the rig has since proven to be considerably more demanding than initially anticipated and the parties on June 24 mutually agreed to terminate the contract with immediate effect.

"Aker Solutions and Statoil have together concluded that the project can't be realized within the framework of the contract," said Per Harald Kongelf, regional president for Norway at Aker Solutions. "Unfortunately, the technological issues weren't solved in the initial system definition phase of the project. We still believe in the concept of Cat B, but the technology needs more time to be developed."

Well-intervention services are used to boost recovery rates from oil and gas production wells and have traditionally taken place on fixed platforms. Ships and rigs have in more recent years been developed to perform the same type of service on subsea wells where recovery rates have been much lower. Developing the subsea technology needed for Cat B to provide the required services in shallow waters proved to be particularly challenging.

"We made significant progress in developing Cat B," Kongelf said. "We will seek to use the experience we've gained to explore future possibilities for maturing and realizing this type of technology."

Each party will be accountable for its own project-related costs. Aker Solutions will in the second quarter book a one-off cost of NOK 375 million, of which NOK 355 million shall be recognized as an impairment of the investments in the Cat B project, while the remaining are operating costs. The charter period's contract value of NOK 11.2 billion will be removed from Aker Solutions' order backlog, which totaled NOK 71.7 billion at the end of March 2013.

The Cat B project was within the company's oilfield services business unit, which Aker Solutions has previously said it intends to spin off. The clarification surrounding the Cat B contract is expected to aid this process.

www.akersolutions.com

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Iranian Port Deal: Modi's Masterstroke

Indian Prime Minister Narendra Modi signed a deal to develop the Chabahar port in Iran for which India will extend $500 million. The historic pact makes Chabahar

Winners of Ferry Design Contest Selected

Winners of International Student Design Competition for a Safe Affordable Ferry to be revealed at the Ferry Safety and Technology Conference   Dr. Roberta Weisbrod,

Maritime Consolidation: Palfinger Aims to Acquire Harding

As maritime markets continue to struggle, merger and acquisition activity should heat up. Today, Austria's Palfinger Group announced that it intends to acquire

Contracts

Olympic Pact with Canyon Offshore

Norwegian offshore shipping company Olympic Shipping has entered into a frame agreement with Canyon Offshore for the joint marketing and subsequent operation of

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Wood Group Bags Statoil MSA

Wood Group has been awarded an evergreen master services agreement (MSA) by Statoil to support the life cycles of its offshore  and onshore facilities. Work and

 
 
Maritime Careers / Shipboard Positions Maritime Standards Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0993 sec (10 req/sec)