Marine Link
Thursday, October 27, 2016

'Zumwalt' (DDG 1000) Deckhouse Module Installed

December 19, 2012

Deckhouse Installed: Photo credit USN

Deckhouse Installed: Photo credit USN

The future 'USS Zumwalt' (DDG 1000), completes a major construction milestone with the successful lift & integration of deckhouse module.

The 1,000-ton deckhouse was fabricated by Huntington Ingalls Industries (HII) in Gulfport, Miss., and delivered to the Navy in October 2012, it was then transported to Bath, Maine for integration with the ship's hull, which is under construction at General Dynamics (GD) Bath Iron Works.

"This is a major milestone for the program as this ship construction progresses," said Capt. Jim Downey, DDG 1000 class program manager, Program Executive Office (PEO) Ships. "The successful integration of the deckhouse and hull is a testament to the tremendous design and planning efforts that were instrumental to this program.


With the successful lift and integration of the deckhouse, 9 of 9 ultra units are now on land level at BIW. 

"The industry government team meticulously planned the 100' static lift of the deckhouse and translation of the 610' hull into position under the deckhouse," said Downey. "The deckhouse was then lowered into position and the resulting ship moved back into the construction position on the land level facility. Working with our industry partners, we look forward to delivering this highly capable ship to the Fleet." 

Construction on DDG 1000 began in February 2009 and is currently 80 percent complete, with ship launch and Christening planned for 2013. The ship is scheduled to deliver in 2014 with an initial operating capability in 2016. Zumwalt will be 610 feet in length, have a beam of 80 feet, displace approximately 15,000 tons, and will have a crew of 130 officers and sailors plus an air detachment. The deckhouse, which is built from steel and composite materials, is 155 feet long and over 60 feet high and will house the ship's bridge, radars, antennas and intake and exhaust systems.

Maritime Reporter Magazine Cover Oct 2016 - Marine Design Annual

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News