'Zumwalt' (DDG 1000) Deckhouse Module Installed

Press Release
Tuesday, December 18, 2012
Deckhouse Installed: Photo credit USN

The future 'USS Zumwalt' (DDG 1000), completes a major construction milestone with the successful lift & integration of deckhouse module.

The 1,000-ton deckhouse was fabricated by Huntington Ingalls Industries in Gulfport, Miss., and delivered to the Navy in October 2012, it was then transported to Bath, Maine for integration with the ship's hull, which is under construction at General Dynamics Bath Iron Works.

"This is a major milestone for the program as this ship construction progresses," said Capt. Jim Downey, DDG 1000 class program manager, Program Executive Office (PEO) Ships. "The successful integration of the deckhouse and hull is a testament to the tremendous design and planning efforts that were instrumental to this program.

"

With the successful lift and integration of the deckhouse, 9 of 9 ultra units are now on land level at BIW. 

"The industry government team meticulously planned the 100' static lift of the deckhouse and translation of the 610' hull into position under the deckhouse," said Downey. "The deckhouse was then lowered into position and the resulting ship moved back into the construction position on the land level facility. Working with our industry partners, we look forward to delivering this highly capable ship to the Fleet." 


Construction on DDG 1000 began in February 2009 and is currently 80 percent complete, with ship launch and Christening planned for 2013. The ship is scheduled to deliver in 2014 with an initial operating capability in 2016. Zumwalt will be 610 feet in length, have a beam of 80 feet, displace approximately 15,000 tons, and will have a crew of 130 officers and sailors plus an air detachment. The deckhouse, which is built from steel and composite materials, is 155 feet long and over 60 feet high and will house the ship's bridge, radars, antennas and intake and exhaust systems.


Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

Navy

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

General Dynamics Delivers North Dakota (SSN-784) to U.S. Navy

General Dynamics Electric Boat yestereday delivered the nuclear-powered attack submarine North Dakota (SSN-784) on time and more than $30 million below target cost.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1799 sec (6 req/sec)