Double-ended Ferry Named at STX Shipyard

Press Release
Sunday, November 25, 2012
Ferry 'Stella': Photo credit STX Finland

STX Finland Oy’s Rauma Shipyard sees the naming & delivery of the new ferry to Suomen Lauttaliikenne Oy (Finferries).

The godmother of the next generation road ferry, Professor Elina Pirjatanniemi, named the ship “Stella” in the presence of invited guests, the representatives of Suomen Lauttaliikenne, STX Finland, and the classification society Bureau Veritas.

The environmentally friendly double-ended ferry, NB 1380, entered production in December 2011 at the STX Finland’s Rauma Shipyard. The vessel will operate in Turku archipelago, Finland, on the Korppoo – Houtskari route, the length and challenging ice conditions of which will set special requirements on the vessel’s performance.

Particular attention has been paid to the ferry’s energy efficiency and safety. The 65 meter long ferry is double-ended, in other words, capable of running in both directions, and accommodates some 250 passengers, three tandem trailers and 39 cars. Stella will enter service at the beginning of 2013. The delivery included three floating link spans, facilitating rapid loading of the ferry.

"The design, procurement and building processes at the STX Finland’s Rauma Shipyard have proceeded according to plans, and the co-operation with the customer, authorities and co-operation partners has gone very smoothly. We are very satisfied to be able to deliver this ferry, representing the cutting edge of shipbuilding in this vessel type, to Finferries and the residents of the Turku archipelago," says Toivo Ilvonen, Director of STX Finland’s Rauma Shipyard.

 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ClassNK Head Attends KOTC Delivery Ceremony

Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

Ferries

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

NZ Interislander Ferry to Dry-dock in Devonport

NewZealand's KiwiRail says that the Interislander ferry Arahura has left Wellington for her scheduled bi-annual dry-docking in Devonport, having last visited Auckland in July 2012.

Voith Schneider Propellers Drive Double-ended Ferry MS Frisia IV

Ferries operated by Norden-Frisia AG have been serving the East Frisian island of Norderney for many decades. Navigation in these coastal waters poses special

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Pipelines Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2238 sec (4 req/sec)