IHC Engineering’s Largest Project to Date

Wednesday, May 26, 2010

On May 31, IHC Engineering Business (EB) will reach a major milestone when their largest project to date, a 2,000t capacity J-Lay system for the Saipem FDS2 (Field Development Ship), leaves its manufacturing location on Teesside.

The lay system will then be en route to the Samsung Heavy Industries’ (SHI) Geoje shipyard in South Korea where EB’s engineers will work closely with Saipem and SHI to install and commission the system on the new build vessel.

The new system is able to accommodate pipes from 4 to 36 inches and is rated at 2,000t hang-off capacity. By adjusting the angle of the tower (from 45 to 96 degrees) the system is capable of laying pipe in deep or shallow water. Key design drivers have been optimization of pipe handling operations to ensure low cycle time, highly constrained working envelopes, and ensuring safety in all aspects of operation.

“There are plenty of fascinating statistics surrounding the J-Lay system including the fact that at 65 metres tall and 14 metres wide it is taller than the nearby Tyne Bridge,” explains Toby Bailey. “The total weight of the tower including all pipe handling equipment is 2,500t and the maximum weight of pipe that can be hung off the tower is equivalent to suspending 266 double-decker buses; there are 25km of cable; 60,000 lines of software code; and over 5km of welding.  Designing and building this first of a kind system has been a remarkable achievement that we are very proud of.”

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Madsen to Chair Norway’s Research Council Executive Board

Henrik O. Madsen appointed chairman of the executive board of the Research Council of Norway   DNV GL president and CEO Henrik O. Madsen was appointed as chairman

Port of Houston Expecting Record Year

The Port of Houston Authority is expecting 2014 to close as a banner year for the port, with 34 million tons of cargo handled through November, Executive Director

Hapag-Lloyd Completes CSAV Merger Capital Increase

Hapag-Lloyd completed the planned capital increase of EUR 370 million (approximately $452.5 million) as part of the business combination with the Chilean shipping

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Port Authority Salvage Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1904 sec (5 req/sec)