Floating Production Expenditure set to Double

press release
Thursday, October 04, 2012

Latin America to account for 29% of installations 2013-2017; FPSOs remain by far the largest segment of the market; Deepwater driving growth, with FPS supply affected by financing, leasing and local content.
 
DW forecast that between 2013 and 2017 $91bn will be spent on floating production systems (FPS) – an increase of 100% over the preceding five-year period. In Douglas-Westwood’s new World Floating Production Market Forecast 2013-2017, a total of 121 floating production units are forecast - a 37% increase.
 
This growth is driven by multiple factors, such as a larger proportion of newbuilds and conversions compared to redeployments, a greater degree of local content resulting in increased costs and general offshore industry cost inflation.
 
Report author, Hannah Lewendon, commented, “Floating Production is firmly established as a cost-effective method of developing oil and gas fields around the world. In water depths beyond 500m floating production systems becomes one of the few options open to operators, an increasingly important factor as production moves into these areas. DW forecast that 63% of global FPS market spend will be in deep waters.
 
“Latin America accounts for 29% of the 121 installations forecast and 37% of the projected Capex. Most installations to date have been in Petrobras-operated fields off Brazil and this trend is likely to continue, although substantial delays are expected for Petrobras’ offshore E&P investment. Asia, then Africa and Western Europe make up much of the remaining forecast Capex.
 
“FPSOs represent by far the largest segment of the market both in numbers (94 installations) and forecast Capex (80%) over the 2013-2017 period. FPSSs account for the second largest segment of Capex, followed by TLPs, then spars.
 
Steve Robertson, Director, concluded, “Overall, the outlook is considered positive and the value of annual installations is projected to grow from $10.2bn in 2013 to $26.2bn in 2017. Three main factors will affect the supply of units in the FPS sector; financing, local content and leasing. The FPSO leasing sector remains weak with 85% utilisation at present compared to 89% at the time of the 2011 edition of the report. Contractors are reporting poor returns on existing projects and write-downs on new projects due to cost over-runs. Financing remains a challenge for leasing contractors and smaller E&P companies as a result of the debt crisis in Europe. At the same time local content requirements are pushing up prices and extending lead times, particularly in Brazil.”
 
 
About the report: Now in its 11th edition, this highly regarded and established report has been tracking and analysing the industry for over a decade. Douglas-Westwood’s market analysis, commentary and understanding of the sector are strengthened by extensive insight gained from strategy and consultancy work undertaken for major companies throughout the industry.
 
The World Floating Production Market Forecast 2013-2017 contains analysis of Capex, broken down by various components including hull, topside modules and mooring systems. It presents analysis based on unique and proprietary data, comprehensive region-by-region analysis, historic and forecast activity from 2008 to 2017, segmentation by region & FPS type, order year analysis and a deepwater focus. For more information on the report visit:
 
For more information on the report visit:


http://www.douglas-westwood.com/shop/shop-infopage.php?longref=1048

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Oceanteam Focuses on Mexico Strategy

Oceanteam Shipping ASA releases its Q2 2014 financial report, with extracts as follows: The company says it saw, with its early focus on Mexico, a long term

Wärtsilä Signs Harvey Gulf OSV Maintenance Agreement

Wärtsilä says it has signed a long-term Technical Management Agreement with Harvey Gulf International Marine LLC (Harvey Gulf). This five-year agreement covers

ABS to Class First Self-elevating Unit Built in Qatar

ABS, a provider of classification services to the global offshore industry, was selected by Nakilat-Keppel Offshore & Marine (N-KOM) to class its LB310S liftboat,

Energy

Narendra Modi Eyes Breakthrough Nuclear Pact with Japan

India is hoping to win Japanese backing for a nuclear energy pact during a visit by Prime Minister Narendra Modi, and lure investment into its $85 billion market

Venezuela Considers Importing Crude for the First Time

PDVSA would use its own fleet to transport imported crude; Purchases of crude imports would reduce costs; Venezuela has been exporting oil for a century Venezuela

ARENA Supporting Bright Ideas in Solar R&D

The Australian Government today announced $21.5 million funding for 12 cutting edge R&D projects that will keep Australia at the forefront of solar research.

News

Narendra Modi Eyes Breakthrough Nuclear Pact with Japan

India is hoping to win Japanese backing for a nuclear energy pact during a visit by Prime Minister Narendra Modi, and lure investment into its $85 billion market

Venezuela Considers Importing Crude for the First Time

PDVSA would use its own fleet to transport imported crude; Purchases of crude imports would reduce costs; Venezuela has been exporting oil for a century Venezuela

USCG Shares Safety Tips for Labor Day, Riverfest

Labor Day weekend marks the unofficial end of the boating season and is known as one of the busiest recreational boating weekends on the Ohio River. With approximately 2,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1493 sec (7 req/sec)