Floating Production Expenditure set to Double

press release
Thursday, October 04, 2012

Latin America to account for 29% of installations 2013-2017; FPSOs remain by far the largest segment of the market; Deepwater driving growth, with FPS supply affected by financing, leasing and local content.
 
DW forecast that between 2013 and 2017 $91bn will be spent on floating production systems (FPS) – an increase of 100% over the preceding five-year period. In Douglas-Westwood’s new World Floating Production Market Forecast 2013-2017, a total of 121 floating production units are forecast - a 37% increase.
 
This growth is driven by multiple factors, such as a larger proportion of newbuilds and conversions compared to redeployments, a greater degree of local content resulting in increased costs and general offshore industry cost inflation.
 
Report author, Hannah Lewendon, commented, “Floating Production is firmly established as a cost-effective method of developing oil and gas fields around the world. In water depths beyond 500m floating production systems becomes one of the few options open to operators, an increasingly important factor as production moves into these areas. DW forecast that 63% of global FPS market spend will be in deep waters.
 
“Latin America accounts for 29% of the 121 installations forecast and 37% of the projected Capex. Most installations to date have been in Petrobras-operated fields off Brazil and this trend is likely to continue, although substantial delays are expected for Petrobras’ offshore E&P investment. Asia, then Africa and Western Europe make up much of the remaining forecast Capex.
 
“FPSOs represent by far the largest segment of the market both in numbers (94 installations) and forecast Capex (80%) over the 2013-2017 period. FPSSs account for the second largest segment of Capex, followed by TLPs, then spars.
 
Steve Robertson, Director, concluded, “Overall, the outlook is considered positive and the value of annual installations is projected to grow from $10.2bn in 2013 to $26.2bn in 2017. Three main factors will affect the supply of units in the FPS sector; financing, local content and leasing. The FPSO leasing sector remains weak with 85% utilisation at present compared to 89% at the time of the 2011 edition of the report. Contractors are reporting poor returns on existing projects and write-downs on new projects due to cost over-runs. Financing remains a challenge for leasing contractors and smaller E&P companies as a result of the debt crisis in Europe. At the same time local content requirements are pushing up prices and extending lead times, particularly in Brazil.”
 
 
About the report: Now in its 11th edition, this highly regarded and established report has been tracking and analysing the industry for over a decade. Douglas-Westwood’s market analysis, commentary and understanding of the sector are strengthened by extensive insight gained from strategy and consultancy work undertaken for major companies throughout the industry.
 
The World Floating Production Market Forecast 2013-2017 contains analysis of Capex, broken down by various components including hull, topside modules and mooring systems. It presents analysis based on unique and proprietary data, comprehensive region-by-region analysis, historic and forecast activity from 2008 to 2017, segmentation by region & FPS type, order year analysis and a deepwater focus. For more information on the report visit:
 
For more information on the report visit:


http://www.douglas-westwood.com/shop/shop-infopage.php?longref=1048


Offshore

STX to Slash Jobs, Sell Yard

To stat above water by restructuring, South Korean Shipbuilder STX Offshore & Shipbuilding Co. plans to lay off about a third of its workforce and sell a yard in France, says a report in WSJ.

Onshore Spending on the Cusp of Recovery?

DW’s recently released quarterly World Oilfield Services Market Forecast (OFS) and World Oilfield Equipment Market Forecast (OFE) continue to suggest 2016 will

US Offshore Lease Sale Yields $18 Mln in High Bids

Today’s U.S. oil and gas Lease Sale 248 garnered $18,067,020 in high bids for 24 tracts covering 138,240 acres in the Western Gulf of Mexico Planning Area, announced

Energy

BP, ExxonMobil, ConocoPhillips 'Quit' Alaska LNG Project

BP, Conoco Phillips, and Exxon Mobil said that the 65-billion dollar megaproject would be too unprofitable for them to move into the next phase of development.

ABS Makes it Safer to ‘Walk to Work’

ABS announced the publication of The ABS Guide for Certification of Offshore Access Gangways. The new Guide addresses certification for safety systems used for “walk to work” (W2W) crew transfers.

Viking Grace Marks 1,000 LNG Bunkering Milestone

From the very beginning, the M/S Viking Grace – delivered in January 2013 – was an environmental milestone.   The vessel attracted global attention as an environmental

News

NASA May Send Submarine to Titan

NASA has unveiled plans to send a submarine into the depths of the largest ocean of Saturn's biggest moon, Titan in a bid to explore the depths of its largest ocean.

Michelle Obama Sponsors Attack Submarine

General Dynamics Electric Boat has delivered to the U.S. Navy an attack submarine that is sponsored by first lady Michelle Obama and will be named for her home state, reports AP.

MV WERFTEN, Foreship Sign Design Agreements

MV WERFTEN signed a letter of intent with the engineering company Foreship in Stralsund today. The agreement includes parts of the basic design as well as design,

 
 
Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1033 sec (10 req/sec)