Marine Link
Saturday, December 3, 2016

GLG Shipyard Applies Finishing Touches to 'Biscayne Bay'

August 10, 2014

Welding work on Cutter Biscayne Bay: Photo GLG

Welding work on Cutter Biscayne Bay: Photo GLG

Great Lakes Group says it has reached the final stages of the routine maintenance and drydock contract on the USCG Cutter BISCAYNE BAY, the second of the USCG’s six Great Lakes-stationed 140-foot Bay-class ice-breaking tugs to be drydocked in the Group's shipyard.

The mainenance project included:

  • Hull Plating and Ultrasonic Testing
  • Appendages and Leak Test
  • Shaft Seal Assembly and Overhaul
  • Rudder Assembly, Remove, Inspect and Reinstall
  • Anchor Windlass, Level 2 Inspect and Repair
  • Vertical Capstan, Level 2 Inspect and Repair
  • Propulsion Shafting, Remove, Inspect, and Reinstall
  •  Various Cleaning, Inspections, and Repairs


 
Maritime Reporter Magazine Cover Nov 2016 - Workboat Edition

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News