New Freight Ferry Grounds on First Trip

Press Release
Tuesday, September 25, 2012
'Huelin Dispatch' Photo courtesy of Huelin-Renouf Shipping

Huelin Renouf Shipping Limited's new freight ferry briefly aground offshore Alderney, UK Channel Islands then limps to Falmouth for drydock repairs.

The 88.6 m freight ferry 'Huelin Dispatch' touched ground SW of Alderney, while on costal passage from Southampton, UK,  and was holed in the after part. After the crew carried out damage control the ship was floated off and headed for drydock in Falmouth.

The owners confirmed that crew and cargo were safe and sound.

Huelin-Renouf Shipping has been serving the Channel Islands since 1935 and is today a leading provider of shipping, transportation and distribution services to and from the Channel Islands and the UK. The head office of Huelin-Renouf is in Jersey, with offices and operational centres in Guernsey, Alderney and the UK.
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

NORDEN’s Dry Cargo Head Bonderup Resigns

Ejner Bonderup, Executive Vice President and member of the Executive Management in Dampskibsselskabet NORDEN A/S, has resigned from his position to take up a position in another shipping company.

Baltic Index Up for Eighth Straight Session

The Baltic Exchange's main sea freight index, tracking rates for ships carrying dry bulk commodities, continued its rise on Friday, for an eighth consecutive session,

Asia Tankers-VLCC Rates Expected to Soften

MidEast rates slip from two-week high on June 28; raft of new ships and repaired vessels weigh on rates. Freight rates for very large crude carriers (VLCCs)

Casualties

Tanker Allision on the Piscataqua River

The U.S. Coast Guard says it is continuing to monitor the condition of the chemical tanker Chem Venus, after it allided with three unoccupied, moored sailboats

Waterway Reopened after Barge Grounding

The U.S. Coast Guard has opened the Red River from mile marker 40 to mile marker 42 for vessel traffic, Monday.   The Red River had been closed due to a barge that had run aground at mile marker 41,

Red River Closed after Barge Grounding

The Red River was closed Sunday from mile marker 40 to mile marker 42, after a barge reportedly ran aground and was protruding into the channel near mile marker 41, according to the U.

Ferries

Tallink Christens LNG Ferry Megastar

A new LNG-driven fast ferry Megastar was christened in Meyer Turku shipyard for owner/operator Tallink Grupp. The environmentally sound ship was christened on

Red Funnel Catamaran Powered by MTU Engines

The latest addition to the British Red Funnel ferry fleet, Red Jet 6, completed first sea trials in June 2016 and will go into service in July. The high-speed catamaran

Hybrid RoPax Ferry Delivered to Royal TESO

Hybrid RoPax ferry Texelstroom has been delivered to Koninklijke N.V. Texels Eigen Stoomboot Onderneming (Royal TESO).   This latest generation symmetrical ferry is powered by efficient,

 
 
Maritime Standards Naval Architecture Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0931 sec (11 req/sec)