PVA & Coast Guard In Hi-speed Vessel Fire Safety Accord

Press Release
Tuesday, March 12, 2013
Signing Ceremony: Photo credit PVA

The Passenger Vessel Association (PVA) & the U.S. Coast Guard sign policy agreement regarding Coast Guard approval of fire protection for newly constructed high-speed vessels.

This agreement is critical to the U.S. shipbuilding industry to ensure delivery of Coast Guard-approved high-speed passenger vessels.

The product of a chartered working group of experienced PVA member industry experts and Coast Guard policy specialists, the agreement details guidelines for pre-approved design criteria including seating arrangements and space dimensions.  This solution allows boat builders to meet the standards of fire safety while facilitating the building of lightweight high-speed aluminum vessels, currently in strong demand.
 
“This agreement ensures high fire protection standards for the safety of passengers and vessels but also provides a pathway for vessel designers, builders, and owners to obtain Coast Guard approval of their building plans,” said 2012 PVA President Paul Belforti. “It returns confidence to the market in that vessels of this type can now be constructed cost effectively.”

The revisions to Coast Guard Navigation and Vessel Inspection Circular (NVIC) 9-97-1 were produced utilizing research advances in fire modeling from the designs of working vessels to most accurately test dimensions and configurations with performance-based engineering analysis.

In the picture (l to r) Rear Admiral Joseph A. Servidio, Assistant Commandant for Prevention Policy, United States Coast Guard and Paul Belforti,
 2012 President, Passenger Vessel Association.
 

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

31 ARENA Projects Completed

ARENA has invested $1 billion in more than 230 projects, fellowships and scholarships that are paving the way for a more diverse energy future for Australia.

Gazprom, OMV Ink Additional Deal

Vienna hosted today the signing of an Addendum to the existing contract for gas supply to Austria between Alexander Medvedev, Deputy Chairman of the Gazprom Management Committee and Gerhard Roiss,

Shipbuilding

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

Imabari Bags Order for 11 ULCCs

Imabari Shipbuilding Co., Ltd. (Imabari), with the cooperation of Marubeni Corporation, has secured newbuilding order for eleven (11) units of 20,000TEU Ultra-Large Container Carriers,

Hogan Named VP at Newport News Shipbuilding

Rob Hogan has been appointed vice president of manufacturing at the Newport News Shipbuilding division of Huntington Ingalls Industries (HII), the company announced.

Passenger Vessels

Lerwick Harbor sees Positive Outlook

Lerwick's importance as a gateway for Shetland’s communities and industries is underlined by an increase in passenger traffic, cargo handled and fish landed in 2014.

Maintenance Woes Led to Digby Ferry Grounding

Maintenance deficiencies and inadequate emergency procedures led to November 2013 grounding of Princess of Acadia in Digby, Nova Scotia    Maintenance deficiencies

Wärtsilä to Power LNG-fueled RoPax Ferry

A ferry being built for Sweden’s Rederi AB Gotland will be fueled by LNG, featuring a Wärtsilä integrated solution which includes a complete LNG powered propulsion- and fuel storage and supply system,

Maritime Safety

Long Beach Port to Boost Power, Speed Clearance

Port of Long Beach Chief Executive Jon Slangerup on Thursday unveiled ambitious plans for congestion-beating smart systems for cargo movement and an all-out

SECNAV Completes Visit to Paraguay

Secretary of the Navy (SECNAV) Ray Mabus completed a visit to Paraguay Jan. 29 during which he met with Republic of Paraguay President Horacio Cartes to discuss

Maintenance Woes Led to Digby Ferry Grounding

Maintenance deficiencies and inadequate emergency procedures led to November 2013 grounding of Princess of Acadia in Digby, Nova Scotia    Maintenance deficiencies

 
 
Maritime Contracts Maritime Standards Navigation Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2115 sec (5 req/sec)