Russia Upgrading Northern Sea Route Safety Infrastructure

Barents Observer
Wednesday, August 15, 2012

Construction of a chain of rescue centers on the shores of the Northern Sea Route has already started.

Russia is upgrading infrastructure along the Northern Sea Route. Three large and seven smaller emergency centers will be built from Murmansk in the West to Chukotka in the East.

According to a new Russian rescue concept, three main Arctic Fire and Rescue Centers will be set up in Siberia, the North-West and Far East Russia. The rest of the centers will be their subdivisions or branches, said Vladimir Puchkov, Russian Minister of Emergency Situations.

Construction of the first centers has now started. One such center with 60 employees is being set up in Dudinka in the Krasnoyarsk Krai. The Siberian center will be equipped with helipads.

In the Far East, the Arctic Centre will be established in Anadyr, and 76 specialists will work there, reported Sergey Petrovsky, Deputy Head of the Far Eastern Regional Center of the Russian Emergency Ministry.

In the North-West, the main Arctic rescue center will be located in Naryan-Mar, in the Nenets Autonomous Okrug. The town holds all necessary conditions, not only to build such a center, but also to develop it, reported Shamsutdin Dagirov, Head of the North-West Regional Center of the Russian Emergency Ministry. The Centre will be able to perform all tasks in the Arctic zone already next year.

BarentsObserver reported earlier that Russia plans to invest nearly €23.4 million in development of the emergency centers. Three of them will be located on Chukotka and Anadyr, the other seven in Murmansk, Arkhangelsk, Naryan-Mar, Vorkuta, Nadym, Dudinka and Tiksi. A total of 980 persons will be working at the centers.
 

Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Maritime Safety

Bulk Carrier Detained; Two Crew Convicted

A Hong Kong flagged vessel was detained in Queensland following a Port State Control (PSC) inspection conducted by the Australian Maritime Safety Authority (AMSA)

Coast Guard Preps for Arctic Research

A team of scientists from the U.S. Coast Guard (USCG) Research and Development Center (RDC) will depart from Seward, Alaska, for a technology evaluation in the

ABS President Wiernicki Signs New MARAD Agreement

The American Bureau of Shipping (ABS) informs that it has entered into a new Memorandum of Agreement (MOA) establishing the policies and procedures regarding the

Arctic Operations

Coast Guard Preps for Arctic Research

A team of scientists from the U.S. Coast Guard (USCG) Research and Development Center (RDC) will depart from Seward, Alaska, for a technology evaluation in the

Rosneft to Carry Out Ecologic Fishery Research in Laptev Sea

For the first time in history of Arctic Rosneft will carry out integrated ecologic fishery research on three licensed sites (LS) of Laptev Sea: Anisinsko-Novosibirsky,

Scientific Team Arctic-bound Aboard Cutter 'Healy'

A team of scientists from the Coast Guard Research and Development Center (RDC) is to depart shortly from Seward, Alaska, for a technology evaluation in the Arctic

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1090 sec (9 req/sec)