USS Abraham Lincoln's Final Mast Section Installed

Posted by Eric Haun
Thursday, August 07, 2014
David Bazemore welds a ceremonial plate into the new mast on the aircraft carrier USS Abraham Lincoln (CVN 72). Also pictured (left to right) are Capt. Ronald L. Ravelo, incoming commanding officer, CVN 72; Ken Mahler, Newport News' vice president, Navy Programs; Capt. Karl O. Thomas, outgoing commanding officer, CVN 72; Bruce Easterson, program director, CVN 72 RCOH; and Newport News shipbuilder Leary Putrell. Photo by Chris Oxley/HII

Newport News Shipbuilding, a division of Huntington Ingalls Industries (HII), marked a major milestone this week in the refueling and complex overhaul (RCOH) of the Nimitz-class aircraft carrier USS Abraham Lincoln (CVN 72). The shipyard installed the final section of the ship's main mast: the 38-foot upper mast section.

A brief mast-stepping ceremony was held Tuesday for Lincoln shipbuilders and the crew on the flight deck of the ship to commemorate the milestone. Mast-stepping ceremonies are a common tradition dating back to ancient Rome and symbolize good luck. During the mast-stepping, commemorative coins and ship memorabilia are placed under the mast section.

Ken Mahler, Newport News's vice president of Navy programs, spoke during the event about the strong partnership between the sailors and shipbuilders. "Since we began the refueling complex overhaul, we've been working side-by-side on this project to recapitalize and modernize the entire ship, such that when she returns to service, Lincoln will continue to be one of the most capable and formidable ships in the world," he said.

The last section of the mast, weighing 33 tons, was lifted in sequence by two cranes. The shipyard's 310-ton gantry crane lifted the mast section onto the flight deck, and then a mobile crane on the flight deck lifted the section into its final position on the mast. The mast, when erected, is too tall for the 310-ton gantry crane to travel over, so the mobile crane completed the lofty installation.

During refurbishment, the original round mast pole was removed and replaced with a modified, tapered square pole to increase strength and keep electrical piping systems enclosed. The square pole is also larger, which allows for waist-high rails and easier access to all areas by internal ladders.

"The ceremony today highlights the workmanship, ingenuity and tenacity of the shipyard workers, sailors, and contractors who have poured their hard work and labor into RCOH," said Capt. Karl O. Thomas, the ship's commanding officer. "I am inspired by the dedication of every member of the integrated team and their commitment to getting Lincoln back to the fight."

USS Abraham Lincoln arrived at Newport News in March 2013 to begin the RCOH process. During the carrier's RCOH, the shipyard refuels the ship's reactors, paints the ship's hull, modernizes systems and performs a complete recapitalization of the entire ship. This process produces a recapitalized carrier capable of supporting current and future warfare doctrine. Once the RCOH is complete, USS Abraham Lincoln will continue to operate in the U.S. Navy fleet for another 25 years. Lincoln's RCOH is 45 percent complete and on track for delivery in October 2016.

huntingtoningalls.com
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Cook Joins Horizon Shipbuilding as Operations VP

Horizon Shipbuilding, Inc. announced that Mickey Cook has joined the corporation as the Vice President of Operations for the Bayou La Batre shipyard. Cook, one of the founders of C & G Boatworks,

Update: SS Central America Salvage

Odyssey Marine Exploration completes current phase of SS Central America recovery; 15,500+ gold and silver coins, 45 gold bars recovered to date; 161,000-square meter,

BAE Systems Awarded 'USS Hopper' Repair Contract

US Department of Defense informs BAE Systems Hawaii, Honolulu, Hawaii, is being awarded a not-to-exceed $22,905,907 undefinitized contract action to a previously

Navy

Today in U.S. Naval History: September 16

Today in U.S. Naval History - September 16 1854 - Cdr. David G. Farragut takes possession of Mare Island, the first U.S. Navy Yard on the Pacific. 1917 -

Austal Delivers Fourth JHSV to the US Navy

The U.S. Navy accepted delivery of USNS Fall River (JHSV 4) from Austal USA yesterday, a week shy of six months from the date they took delivery of JHSV 3. This

Washington Navy Yard Remembers Shooting One Year Later

It was a day no one who worked on the Washington Navy Yard will ever forget. Shortly after 8 a.m., on Sept. 16, 2013, Navy contractor Aaron Alexis entered the Naval

Marine Equipment

Cat, Deltamarin Develop Modular FPSO Power Unit

Caterpillar Launches New Modular Solution Developed with Deltamarin for FPSO and Offshore Platform Main Power at 2014 Rio Oil & Gas Expo and Conference Caterpillar

Gas Turbine Acceptance Test Completed for S. Korea Navy

Rolls-Royce has reached a milestone in the Republic of Korea Navy’s FFX frigate program, with the successful completion of acceptance tests for the MT30 gas turbine.

Mercury Marine Launches Repower Financing

Mercury Marine launched a new repower finance program that aims to make it easier for consumers to get the engine performance they want with flexible financing for a broad range of buyers.

Eye on the Navy

Austal Delivers Fourth JHSV to the US Navy

The U.S. Navy accepted delivery of USNS Fall River (JHSV 4) from Austal USA yesterday, a week shy of six months from the date they took delivery of JHSV 3. This

Washington Navy Yard Remembers Shooting One Year Later

It was a day no one who worked on the Washington Navy Yard will ever forget. Shortly after 8 a.m., on Sept. 16, 2013, Navy contractor Aaron Alexis entered the Naval

Gas Turbine Acceptance Test Completed for S. Korea Navy

Rolls-Royce has reached a milestone in the Republic of Korea Navy’s FFX frigate program, with the successful completion of acceptance tests for the MT30 gas turbine.

Vessels

Austal Delivers Fourth JHSV to the US Navy

The U.S. Navy accepted delivery of USNS Fall River (JHSV 4) from Austal USA yesterday, a week shy of six months from the date they took delivery of JHSV 3. This

Gladding-Hearn Delivers Third NYPD Boat

With more than a dozen patrol boats and a fireboat built by Gladding-Hearn Shipbuilding, Duclos Corporation, operating in New York Harbor, the Somerset, Mass.,

Survey Vessel Delivered to Fugro N.V.

Fugro Pioneer is the second of three vessels to be delivered to Fugro in 2014. Fugro has taken delivery of the second of the three Fugro Offshore Coastal Survey

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1347 sec (7 req/sec)