Marine Link
Friday, October 28, 2016

Jetty on APL Panama

February 10, 2006

The container vessel APL Panama, stranded since Christmas Day off an Ensenada beach, now has its own jetty. Salvors commissioned the 500-foot rock-and-sand ramp and hired a giant crane to carry containers ashore. The operation is the latest in a series of attempts to lighten the ship's load and get it floating again. Weighed down by cargo and pinned in by sand, the 880-foot APL Panama has refused to leave the broad sandy beach where it ran aground more than seven weeks ago. Led by Florida-based Titan Maritime LLC, salvage efforts since the grounding reportedly have succeeded in moving the bow 35 degrees, about a third of the distance necessary to pull it away from shore. A major effort late last month involved six tugboats and a barge equipped with hydraulic pullers, with a combined capacity of more than 80,000 horsepower. On February 9, containers were hooked to the crane and lifted off the ship. The 300-ton crawler crane, with a 250-foot boom, has been working around the clock since February 5, and moving up to 60 containers per day. Leaders of the salvage effort had hoped they wouldn't have to resort to the costly land-based operation. (Source:

Maritime Reporter Magazine Cover Oct 2016 - Marine Design Annual

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News