Kvaerner Wins Hild Jacket Contract

Monday, February 13, 2012
Total E&P Norge AS has awarded Kvaerner an EPSC-contract (Engineering, Procurement, Supply and Construction) of close to NOK 1.2 billion for delivery of a steel jacket to be located at the Hild Field offshore the Norwegian North Sea.  "We are very pleased to have won our second jacket this year in tough international competition. This is in line with our strategy, and demonstrates our strong position in the jacket EPC market, says Nina Udnes Tronstad, Executive Vice President in Kvaerner responsible for the jacket business. 
The contract will be executed by Kvaerner's yard in Verdal, and includes engineering, procurement, supply, construction, load-out and sea-fastening of the jacket and associated piles. The jacket (16 500 tonnes) and piles will have a total weight of approximately 21 400 tons. Detailed engineering starts immediately, while fabrication in Verdal will commence in fourth quarter 2012. The project will reach its peak manpower of more than 400 persons in third quarter 2013. The Hild jacket will be delivered in the  spring of 2014, and becomes number 42 in the series of jackets delivered by Kvaerner since 1975. 
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

DMW Marine Takes the Lead in Military Cranes

DMW Marine Group, LLC. has completed a number of projects for the U.S. Navy and foreign Navies in recent years, claiming a place as a go-to supplier for Navy departments globally.

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

Two ASC Kalmar Cranes for DP World Brisbane

Kalmar, part of Cargotec, has received an order from DP World Australia to deliver two new Kalmar automatic stacking cranes (ASCs) for its semi-automated terminal in Brisbane.

Shipbuilding

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

Offshore

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

IMO Adopts Polar Code Environmental Provisions

United Nations' International Maritime Organization (IMO) has adopted the environmental part of the Polar Code. Hereby, internationally binding regulations on

Two Hurt in Petrobras Platform Accident; Output Halted

Brazil's state-led oil company Petrobras was forced to stop output at its P-56 offshore oil production ship on Wednesday in the Marlim Sul field after an explosion

 
 
Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1986 sec (5 req/sec)