Craig Group Launches New PSV

MarineLink.com
Thursday, May 30, 2013
Grampian Sceptre (Photo: The Craig Group)

Family owned shipping firm The Craig Group launched its latest Platform Supply Vessel (PSV), the Grampian Sceptre this week at the Balenciaga Shipyard in Northern Spain.

The vessel was officially christened by Mrs. Frances Murray, wife of Alistair Murray, Logistics Team Lead at Talisman Sinopec Energy U.K. Ltd.

Craig Group committed £50M to the construction of this vessel, and it’ sister vessel the Grampian Sovereign. The vessels are the largest ever built by Craig Group and both have secured long term contracts with Talisman Sinopec Energy U.K. Limited. The Grampian Sovereign commences work this week in the North Sea while the Grampian Sceptre will start her contract in September later this year. 

Managed by Craig Group division North Star Shipping, the two IMT-982 designed vessels have created 50 new jobs for the Aberdeen based company.

Craig’s Group continues to operate the largest and most modern British wholly owned fleet engaged in the U.K. offshore industry, supporting 50 installations in the North Sea.

Douglas Craig, Chairman and Managing Director of Craig Group, said, “Our major investment in state of the art oilfield support vessels firmly underpins our position as market leaders in the provision of offshore support, ROV Survey, platform supply and emergency response and rescue vessels. It also shows our commitment to the marine industry and that we continue to offer our customers an unrivalled service.

The vessels are 83 meters long with an 18-meter beam and have diesel electric propulsion systems offering a greater fuel economy and efficiency. They have been specifically designed to meet the requirements of operators in the North Sea.

North Star managing director, Callum Bruce, said, “We are constantly looking at ways of expanding and modernizing our fleet. These vessels feature the most up to date technology and designs, meeting our customers’ needs in terms of safety, quality and efficiency.”

This investment brings the total new-build program by Craig Group since 2003 to over £230 million, representing 22 new vessels built.

At present the fleet stands at 36 vessels and includes a mix of Platform Supply, Tanker Assist, ROV Survey, as well as Emergency Response and Rescue Vessels.
 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

OSI to Integrate Software for UK Royal Navy

OSI Maritime Systems (OSI) announced the signing of a contract to integrate its flagship software, ECPINS-W Sub, into the U.K. Royal Navy’s T45 Destroyer Integrated Bridge System (IBS).

HHI to Deploy 3DEXPERIENCE Design Platform

Hyundai Heavy Industries Selects Marine & Offshore Industry Solution Experiences for Design and Engineering of Offshore Structures Dassault Systèmes, the 3DEXPERIENCE Company,

Canadian Icebreaker Refit Contracts Awarded

The Canadian Government informs it has awarded a $6.5 million contract to Babcock Canada Inc. for critical refit work for Canadian Coast Guard ship 'CCGS Louis S.

Vessels

OSI to Integrate Software for UK Royal Navy

OSI Maritime Systems (OSI) announced the signing of a contract to integrate its flagship software, ECPINS-W Sub, into the U.K. Royal Navy’s T45 Destroyer Integrated Bridge System (IBS).

Scafi Expands Fleet with Italian Damen Tug

Damen is to construct a new ASD 3212 tug for Scafi, the Italian shipping group that includes a number of international towing companies. The contract cements their

Knightsbridge, Frontline to Form US Capesize Company

Knightsbridge Tankers Limited and Frontline 2012 Ltd. have announced an agreement to combine Frontline 2012's remaining fleet of 25 fuel efficient vessels with Knightsbridge.

Offshore Energy

Diamond Offshore Shares on the Rise

Diamond Offshore Drilling Inc, one of the world's top five offshore rig contractors, reported a better-than-expected quarterly profit as it cut drilling costs and hiked prices,

Offshore O&G: Cuts, Delays in Norway as Costs Soar

More oil and gas projects in Norway could be put on hold because of rising costs, adding to a growing list of developments that have been delayed or called off,

Norway's Oil Sector May Face More Project Cuts, Delays

More oil and gas projects in Norway could be put on hold because of rising costs, adding to a growing list of developments that have been delayed or called off,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1230 sec (8 req/sec)