NASSCO Launches USNS William McLean

Press Release
Tuesday, April 19, 2011

SAN DIEGO – General Dynamics NASSCO, a wholly owned subsidiary of General Dynamics (NYSE: GD), today launched the U.S. Navy’s newest supply ship, USNS William McLean (T-AKE 12), during an evening christening ceremony at the shipyard.  The USNS William McLean is the 12th of a class of 14 dry cargo/ammunition ships slated to serve as Combat Logistics Force (CLF) ships or be part of the Maritime Prepositioning Force. 

USNS William McLean is named after William Burdette McLean (1914–1976), the U.S. Navy physicist who conceived and developed the heat-seeking Sidewinder missile. The Sidewinder was the first effective heat-seeking, short-range, air-to-air missile carried by fighter aircraft.  After five decades, variants and upgrades of the Sidewinder remain in active service with many air forces today.

More than 1,000 people attended the evening launch of the USNS William McLean at the NASSCO shipyard.  McLean’s eldest niece, Mrs. Margaret Taylor, served as the ship’s sponsor.  Mrs. Taylor christened the ship by breaking the traditional bottle of champagne against the bow before the 689-foot-long vessel slid into the waters of San Diego Bay. 

During World War II, McLean worked on ordnance equipment and testing at the National Bureau of Standards in Washington, D.C. Following the war, he moved to the Naval Ordnance Test Station in Inyokern, Calif. (now the Naval Air Weapons Station China Lake), where he led the project team developing the Sidewinder missile from 1945 to 1954.  In April 1954, he was appointed technical director, the senior civilian position at the station, a position which he held until 1967.  He then served as technical director for the U.S. Navy's submarine-warfare research center in San Diego until 1974.

“We at NASSCO are proud of the role the USNS William McLean will play in support of the U.S. Navy,” said Fred Harris, president of NASSCO.   “This ship joins a distinguished tradition of NASSCO-built or modified ships bound for service under the direction of the Navy’s Military Sealift Command.”

USNS William McLean is the twelfth ship of the 14-ship Lewis and Clark (T-AKE) Class of dry cargo ammunition ships General Dynamics NASSCO is building for the Navy’s Military Sealift Command.  NASSCO began constructing USNS William McLean in September 2009.  Following its at-sea testing phase, the ship will be delivered to the Navy in the third quarter of 2011.  When delivered to the Military Sealift Command, the ship will carry necessary supplies and equipment required to support U.S. Marine Corps operations anywhere in the world.

There are currently 16 Military Sealift Command prepositioning ships that have been especially configured to transport supplies for the U.S. Marine Corps.  Nearly half of the ships in this Maritime Prepositioning Force were built or modified at General Dynamics NASSCO since the mid-1980s and are now forward-deployed to the western Pacific Ocean, the Indian Ocean and the Mediterranean Sea. 

Source: NASSCO


Shipbuilding

Höegh Readies New Horizon Vessels

Höegh Autoliners ordered the latest additions to its fleet, the New Horizon vessels, in which the information technology on board is fully integrated and connected

VLCC Delivered to Gener8 Maritime

Gener8 Maritime, Inc., a U.S.-based provider of international seaborne crude oil transportation services, announced that it has taken delivery of the ECO VLCC the Gener8 Macedon on August 30,

Elcome Supplies Electronics for Abu Dhabi New Builds

Elcome International is supplying electrical switchboards, safety, monitoring and control systems for three vessels under construction at Abu Dhabi Ship Building (ADSB).

Navy

Royal Navy Warship Goes to Libya

The UK provided RFA Mounts Bay to support the Danish-led maritime operation, escorting a Danish transport ship through the Mediterranean as it carried the chemicals,

Ingalls Secures Design Work for US Navy’s New LX(R) Ships

Huntington Ingalls Industries (HII) announced that its Ingalls Shipbuilding division has been awarded a $13.7 million contract (with incremental funding) to perform contract design effort for the U.

This Day In Naval History: August 31

1842 - Congress replaces the Board of Navy Commissioners, a group of senior officers who oversee naval technical affairs, with the five technical Bureaus, ancestors of the Systems Commands.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Electronics Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1069 sec (9 req/sec)