NASSCO Launches USNS William McLean

Press Release
Tuesday, April 19, 2011

SAN DIEGO – General Dynamics NASSCO, a wholly owned subsidiary of General Dynamics (NYSE: GD), today launched the U.S. Navy’s newest supply ship, USNS William McLean (T-AKE 12), during an evening christening ceremony at the shipyard.  The USNS William McLean is the 12th of a class of 14 dry cargo/ammunition ships slated to serve as Combat Logistics Force (CLF) ships or be part of the Maritime Prepositioning Force. 

USNS William McLean is named after William Burdette McLean (1914–1976), the U.S. Navy physicist who conceived and developed the heat-seeking Sidewinder missile. The Sidewinder was the first effective heat-seeking, short-range, air-to-air missile carried by fighter aircraft.  After five decades, variants and upgrades of the Sidewinder remain in active service with many air forces today.

More than 1,000 people attended the evening launch of the USNS William McLean at the NASSCO shipyard.  McLean’s eldest niece, Mrs. Margaret Taylor, served as the ship’s sponsor.  Mrs. Taylor christened the ship by breaking the traditional bottle of champagne against the bow before the 689-foot-long vessel slid into the waters of San Diego Bay. 

During World War II, McLean worked on ordnance equipment and testing at the National Bureau of Standards in Washington, D.C. Following the war, he moved to the Naval Ordnance Test Station in Inyokern, Calif. (now the Naval Air Weapons Station China Lake), where he led the project team developing the Sidewinder missile from 1945 to 1954.  In April 1954, he was appointed technical director, the senior civilian position at the station, a position which he held until 1967.  He then served as technical director for the U.S. Navy's submarine-warfare research center in San Diego until 1974.

“We at NASSCO are proud of the role the USNS William McLean will play in support of the U.S. Navy,” said Fred Harris, president of NASSCO.   “This ship joins a distinguished tradition of NASSCO-built or modified ships bound for service under the direction of the Navy’s Military Sealift Command.”

USNS William McLean is the twelfth ship of the 14-ship Lewis and Clark (T-AKE) Class of dry cargo ammunition ships General Dynamics NASSCO is building for the Navy’s Military Sealift Command.  NASSCO began constructing USNS William McLean in September 2009.  Following its at-sea testing phase, the ship will be delivered to the Navy in the third quarter of 2011.  When delivered to the Military Sealift Command, the ship will carry necessary supplies and equipment required to support U.S. Marine Corps operations anywhere in the world.

There are currently 16 Military Sealift Command prepositioning ships that have been especially configured to transport supplies for the U.S. Marine Corps.  Nearly half of the ships in this Maritime Prepositioning Force were built or modified at General Dynamics NASSCO since the mid-1980s and are now forward-deployed to the western Pacific Ocean, the Indian Ocean and the Mediterranean Sea. 

Source: NASSCO

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Damen Shipyards Galati wins Dutch Romanian Award

Damen Shipyards Galati has been presented with the Dutch Romanian Business Award for its Corporate Social Responsibility plan, particularly the Group’s community investment initiatives.

Cecon Secures Finances to Complete Newbuild

Cecon ASA has petitioned for a debt restructuring agreement (in Norwegian: gjeldsforhandling). Certain funds managed by York Capital Management Global Advisors,

NMEA Updates Installation Standards

2014 edition of NMEA 0400, Version 4.00 features extensive updates and new information   The National Marine Electronics Association (NMEA) has published Edition 2014, Version 4.

Navy

NRL Researchers Demo Ship-to-Shore Data Link

Scientists at the U.S. Naval Research Laboratory (NRL) along with Mercury Continuity (MC) have demonstrated the Tactical Reachback Extended Communications (TREC) system in the port of Miami.

NASSCO Opens Bremerton Repair Facility

General Dynamics NASSCO celebrated the grand opening of its new location in Bremerton, Wash., yesterday. The facility will support the company’s recently-awarded contract to repair and maintain U.

NASSCO Opens New Facility for Naval Repair

General Dynamics NASSCO opened a new location yesterday in Bremerton, Wash. to support the company’s recently-awarded contract to repair and maintain U.S. Navy

 
 
Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1880 sec (5 req/sec)