Robert Allan Design New Canadian Coast Guard SAR Lifeboats

MarineLink.com
Monday, July 15, 2013
Canadian Coast Guard SAR Lifeboat: Photo courtesy of Robert Allan

Robert Allan Ltd. has designed a new generation of more capable High Endurance Self-righting Search & Rescue Lifeboats for the Canadian Coast Guard.

This new design was developed from the successful similar vessels known as the “Severn” Class operated by the Royal National Lifeboat Institution (RNLI) of the United Kingdom. The new Canadian design is larger with a greater range than the RNLI vessel and has been specifically designed to handle the worst weather encountered year around in the waters off Newfoundland and Nova Scotia. The new design is also for construction in aluminium rather than FRP as are the Severn Class.

Construction of 10 vessels of this Class is being considered by the Coast Guard to replace existing Arun Class vessels, which are reaching the end of their service life. The High Endurance Search and Rescue Lifeboats will provide greatly enhanced speed, range and weather operability to the Coast Guard enhancing their capability to perform Search and Rescue Missions.

The new Search & Rescue Lifeboats are self-righting and capable of safe operation in extreme weather up to Beaufort Force 12 conditions and are able to survive in 12 meter seas.

The vessel’s particulars are as follows:

  • Length overall 19.0  metres
  • Length DWL 17.5  metres
  • Beam, moulded  6.3  metres
  • Depth, moulded, at midship 2.58  metres
  • Hull draft, nominal  1.67  metres
  • Power   2,400  kW
  • Speed   23.5   kts

A large well-appointed enclosed bridge amidships provides maximum visibility and protection for the crew and enables the vessel to self-right in all loading conditions. A survivor space is located forward below decks, and the machinery space is aft. A bow thruster is fitted forward for enhanced manoeuvrability.

Normal vessel complement is a crew of four. Seating is provided for an additional two supernumeraries such as medical personnel, two survivors (on stretchers) and up to twelve survivors (seated). In support of the vessel's secondary missions including Aids to Navigation, Environmental Response, Maritime Security, DFO Science, DFO Fisheries and Aquaculture Management and other Government Activities the vessel will occasionally be used to transport up to sixteen (16) supernumeraries in addition to the vessel's crew.

The vessel has been designed to meet or exceed all requirements of Lloyds Register Rules and Regulations for the Classification of Special Service Craft, July 2012.
 

 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

General Dynamics gets $25 mi GPS Contract from Lockheed Martin

General Dynamics Advanced Information Systems, a business unit of General Dynamics, was awarded a $25.4 million full-production contract from Lockheed Martin to support the U.

Globecomm to Provide VSAT for PBJV Barge

Purpose-built accommodation and pipe-lay barge on charter to Petronas equipped with VSAT and L-Band services. Globecomm Maritime has been awarded a contract

VSTEP Wins Mexican Navy Simulator Contract

The Mexican Navy selected VSTEP to supply a Class A NAUTIS Full Mission Bridge (FMB) Simulator and 24 NAUTIS desktop trainer stations for the Naval Academy in Veracruz.

Workboats

North Sea Atlantic Joins the Technip fleet

On Saturday July 26, 2014, a ceremony was held in Bergen to officially name the latest new subsea construction vessel to join the Technip fleet, the North Sea Atlantic.

HydroComp to Hold Propeller 'Mini-Workshop'

A special version of HydroComp's intensive Propeller Workshops will be brought to Tampa before the start of IBEX 2014.   The Mini-Workshop is a special version

Crowley Christens New DP2 Tugboat

Crowley Maritime Corp. said that the third of four tugboats in the Ocean-class series, Ocean Sky, has been christened in Houston. The ceremony served to formally

Maritime Safety

Resolve Maritime Academy's New Wet Trainer Facility

Resolve Maritime Academy says it has started on the construction of a new, two-story wet trainer, larger and more expansive than its original, the L/V Gray Manatee.

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Charter Boat Crew Rescued in Gulf of Mexico

U.S. Coast Guard search and rescue crews worked throughout the night to find a missing charter boat with four people aboard as far as 70 miles off Galveston. A

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1637 sec (6 req/sec)