First Steel Cut for Liftboat ‘Seajacks Hydra’

Press Release
Friday, November 30, 2012
Photo by Seajacks

A ceremony marked the event at Lamprell’s Hamriyah Dubai facility.


The self-elevating, ‘Seajacks Hydra’ has been specifically designed for installation and maintenance services in the offshore wind and oil and gas sectors. The vessel will be equipped with a high speed jacking system, a 400t crane and able to operate in water depths up to 48m.


Lamprell Energy has built all three of Seajacks’ current vessels; ‘Kraken’, ‘Leviathan’ and ‘Zaratan’, delivering each on time and on budget. Since becoming operational from 2010, Seajacks vessels have installed 230 turbines on wind farm projects in the UK and performed work for major oil and gas clients including ExxonMobil, TAQA and Shell.


Seajacks ‘Kraken’ is currently undertaking a two year well intervention and maintenance campaign for Shell UK and NAM in the Southern North Sea, while Seajacks Leviathan and Seajacks Zaratan work in tandem on the construction of the Meerwind Offshore Wind Park in Germany.


Seajacks Hydra is scheduled for delivery in the second half of 2014.
 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Newport News, ODU Partner for Bachelor's Degree Program

Huntington Ingalls Industries (HII) announced today that apprentices at Newport News Shipbuilding will now have the opportunity to earn a bachelor of science degree

Azeri Shipyard, BP Sign Vessel Construction Contract

Azeri state energy company SOCAR's shipyard and British oil major BP have signed a $378 million deal to design and build a subsea construction vessel for the Shah Deniz II gas project,

Fishing Vessels Fit with Wärtsilä’s NOx Reducer

Wärtsilä said its new NOx Reducer will be fitted to two new fishing vessels under construction at the Celiktrans yard in Turkey. The ships are owned by HB Grandi,

Offshore

GulfMark Offshore Records Highest Ever Q1 Revenue

Houston-based GulfMark Offshore President & CEO Quintin Kneen commented on his company's first quarter 2014 financial report: "We recorded our highest first quarter revenue ever,

Offshore Oil & Gas: Brazil’s Northern Frontier

In an effort to spread out oil and gas production to other parts of the country and increase overall oil production, Brazil has finally intensified hydrocarbon

Safety the Focus as Heavy Lifting Picks Up

Modern heavy lift capabilities are crucial for safe, efficient operations offshore Heavy lift operations offshore are an awe-inspiring feat, but an operation that

Energy

Baker Hughes Announces Q2 Conference Call

Baker Hughes Incorporated (NYSE: BHI) announced today that it has scheduled a conference call on Thursday, July 17, 2014, to discuss results for the second quarter 2014, ending June 30, 2014.

Explosion Rocks Natural Gas Processing Plant In Wyoming

An explosion on Wednesday rocked a natural gas-processing plant in Wyoming that can churn out about 2 percent of the daily U.S. gas supply, though no injuries were reported.

Euronav Posts 62% Core Profit Increase

Belgian crude oil shipping group Euronav on Wednesday unveiled a 62 percent rise in first-quarter core profit as daily rates for its fleet rebounded from last year.

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1589 sec (6 req/sec)