Fugro Geos Wins Maintenance Contract

(Press Release)
Tuesday, February 14, 2012
Fugro GEOS won a contract award which provides Qatar Shell with support for a seabed water temperature monitoring system.  The 5-year contract will ensure round-the-clock support and maintenance of the metocean monitoring system, which is part of the Pearl GTL (gas-to-liquids) project in Ras Laffan, Qatar.  Pearl GTL is jointly developed by Qatar Petroleum and Shell.
Designed, installed and maintained by Fugro GEOS, the monitoring system is a critical element, providing real-time information to help minimise flow assurance problems in pipelines which link the two Pearl offshore platforms with the onshore plant.  Using acoustic telemetry, data are sent from the seabed to the platforms and the system interfaces in real-time with the platform’s control system.  When the seabed water temperature reaches a specified level, an alarm is triggered so that action can be taken to manage and maintain the flow of gas through the pipelines.
The Pearl GTL Project involves the export of natural gas under pressure from the unmanned platforms over a distance of around 60 kilometres.  The compressed gas flows via pipelines, located at a depth of approximately 30 metres, to the giant onshore plant in Ras Laffan Industrial City, the largest energy project in Qatar.  When the seabed water temperature falls, hydrate crystals can form in the pipeline and these could restrict the flow of gas and may seriously damage the pipelines.  Injecting the flowlines with kinetic hydrate inhibitors avoids the formation of hydrates and minimises the risk of pipeline blockages.
“Monitoring the seabed water temperature has contributed to maintaining a steady flow of feed gas from the offshore platforms to the onshore facility,” said Anthony Gaffney, Director of Fugro GEOS’ Offshore Systems Division.  “The ability to accurately measure the water temperature along the export pipelines and identify when kinetic hydrate inhibitors are needed eliminates the need to purchase, transport, store, pump and then remove the inhibitors and this translates into cost savings.
“Because our monitoring system does not require divers for deployment or recovery, it is readily retrofitted and recovered so intervention costs are minimised and safety is enhanced.  Also, as the system uses acoustic telemetry, there is no requirement for subsea cables which may suffer damage and which would be costly to replace over the lifetime of the project.”
Under the maintenance contract Fugro GEOS provides the services of an experienced metocean engineer as well as critical upgrades to Fugro GEOS’ Weather Monitor software.  Local 24-hour support in Qatar is provided by associate company Petrotec’s trained service engineers.
Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

NYK Opens New Planning Center in Kumamoto

On September 1, 2014, NYK and Kozo Keikaku Engineering Inc. established a stowage planning center for container shipping at the Kumamoto office of Kozo Keikaku Engineering Inc.

TNO Receives 'International Media Award for Prevention'

The Engagementgame developed by TNO in collaboration with partners is the winner of the 'International Media Award for Prevention' in the category Multi Media.

More German Shipowners Look to Gibdock for Repairs

Gibdock remarks it has continued to see its stock rise amongst the German shipowner community over the past year. Indeed the Gibraltar ship repair yard’s recent

Contracts

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

NZ Interislander Ferry to Dry-dock in Devonport

NewZealand's KiwiRail says that the Interislander ferry Arahura has left Wellington for her scheduled bi-annual dry-docking in Devonport, having last visited Auckland in July 2012.

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1465 sec (7 req/sec)