Fugro Geos Wins Maintenance Contract

(Press Release)
Tuesday, February 14, 2012
Fugro GEOS won a contract award which provides Qatar Shell with support for a seabed water temperature monitoring system.  The 5-year contract will ensure round-the-clock support and maintenance of the metocean monitoring system, which is part of the Pearl GTL (gas-to-liquids) project in Ras Laffan, Qatar.  Pearl GTL is jointly developed by Qatar Petroleum and Shell.
Designed, installed and maintained by Fugro GEOS, the monitoring system is a critical element, providing real-time information to help minimise flow assurance problems in pipelines which link the two Pearl offshore platforms with the onshore plant.  Using acoustic telemetry, data are sent from the seabed to the platforms and the system interfaces in real-time with the platform’s control system.  When the seabed water temperature reaches a specified level, an alarm is triggered so that action can be taken to manage and maintain the flow of gas through the pipelines.
The Pearl GTL Project involves the export of natural gas under pressure from the unmanned platforms over a distance of around 60 kilometres.  The compressed gas flows via pipelines, located at a depth of approximately 30 metres, to the giant onshore plant in Ras Laffan Industrial City, the largest energy project in Qatar.  When the seabed water temperature falls, hydrate crystals can form in the pipeline and these could restrict the flow of gas and may seriously damage the pipelines.  Injecting the flowlines with kinetic hydrate inhibitors avoids the formation of hydrates and minimises the risk of pipeline blockages.
“Monitoring the seabed water temperature has contributed to maintaining a steady flow of feed gas from the offshore platforms to the onshore facility,” said Anthony Gaffney, Director of Fugro GEOS’ Offshore Systems Division.  “The ability to accurately measure the water temperature along the export pipelines and identify when kinetic hydrate inhibitors are needed eliminates the need to purchase, transport, store, pump and then remove the inhibitors and this translates into cost savings.
“Because our monitoring system does not require divers for deployment or recovery, it is readily retrofitted and recovered so intervention costs are minimised and safety is enhanced.  Also, as the system uses acoustic telemetry, there is no requirement for subsea cables which may suffer damage and which would be costly to replace over the lifetime of the project.”
Under the maintenance contract Fugro GEOS provides the services of an experienced metocean engineer as well as critical upgrades to Fugro GEOS’ Weather Monitor software.  Local 24-hour support in Qatar is provided by associate company Petrotec’s trained service engineers.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

WCI Applauds Increased USACE Funding

Today WCI applauded the leadership of Senate Appropriations Committee Chairman Thad Cochran (R-MS) and Senate Energy & Water Development (E&WD) Appropriations Subcommittee

SoCal Beach Cleanup Could Take Months

The U.S. Coast Guard captain overseeing cleanup of oil spilled from a pipeline rupture that closed two California state beaches and fouled offshore waters near

MPC Honors Crowley for Tank Vessel Safety

Crowley Maritime Corporation’s petroleum services division has once again been honored by Marathon Petroleum Company (MPC) with its annual Elite Vessel Award, which

Contracts

DMW Marine Takes the Lead in Military Cranes

DMW Marine Group, LLC. has completed a number of projects for the U.S. Navy and foreign Navies in recent years, claiming a place as a go-to supplier for Navy departments globally.

Shipping Freight Rates Drop Amidst Overcapacity

Shipping freight rates on the world's busiest route, from Asia to Northern Europe, fell by the largest percentage amount since 2008, reflecting wild volatility

Two ASC Kalmar Cranes for DP World Brisbane

Kalmar, part of Cargotec, has received an order from DP World Australia to deliver two new Kalmar automatic stacking cranes (ASCs) for its semi-automated terminal in Brisbane.

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1546 sec (6 req/sec)