The MV Handan Steel is an ore carrier belonging to an English company, size: LOA 330m Breadth 60m. The main engine repair involved the chemical cleaning of the heat exchanger, M/E air cooler x 2sets, main L/O cooler x 1set, and main & auxiliary atmosphere condenser repair. The deck work scope mainly included No.5 cargo hold bulkhead partial steel renewal, E/R main engine ventilation duct to be cropped and renewed, installation of the limit for aft D/E. The coating work included SA2 sandblasting for the bulkhead of five cargo holds from 16m high downwards with painting of two F/C, totally 14,630 m2, and the hull (16000m2) to be SA2 sandblasted with painting of two T/C, one F/C. The contracting time was 12 days.