The international verification and engineering RINA Group will carry out Basic Engineering Design, Environmental and Social Impact Assessment, Safety and other studies for the expansion of Greece’s only LNG terminal, at Revithoussa. The four month project was awarded to RINA by DESFA (Hellenic Gas Transmission System Operator S.A.). The expansion of the LNG Revithoussa Terminal Cryogenic Facilities will boost the maximum sustainable gas send-out rate to 1400 Nm3/h (with a peak send-out rate of 1650 Nm3/h). The existing terminal consists of an import jetty, two full containment storage tanks, plus one under construction, re-gasification equipment and send-out facilities.