USCG Icebreaking Tug Up for Drydocking
U.S. Coast Guard Cutter Katmai Bay (WTGB-101), homeported in Sault Sainte Marie, Michigan, arrived at Great Lakes Shipyard, Cleveland, Ohio, for drydocking, inspection, maintenance and repairs on July 8, 2015. The contract is for a scope of work that includes hull, propulsion and steering system inspections, as well as steel repairs, hull cleaning and painting. The 140-foot Bay-class Icebreaking Tug was hauled out on Monday, July 13 using the Shipyard’s 770-ton Marine Travelift – the largest on the Great Lakes.
Great Lakes Shipyard Replaces Propulsion Controls on USCG Cutter
Great Lakes Shipyard is completing the replacement of the main propulsion control system on the United States Coast Guard Cutter Mobile Bay. This work marks the final installation under a five-year contract with the USCG’s Engineering Logistics Center, Baltimore, Md. This contract included installation of new main propulsion control systems for the entire fleet of nine 140-foot Bay Class of Ice Breaking tugs. The Shipyard’s mobile vessel crew is conducting the work on-site in Sturgeon Bay, Wisconsin and is to be completed in early October.