Marine Link
Friday, April 26, 2024
SUBSCRIBE

Material Off Loading Facility News

23 Apr 2019

Johor Port, Petronas LNG Sign Services Pact

Johor Port Berhad has signed an agreement with Petronas LNG Ltd. to provide marine services for vessels that receive gassing up and cooling down (GUCD) services at PLL’s Regasification Terminal Pengerang.According to a press release from integrated multi-purpose port facility located at the southern tip of Peninsular Malaysia, the signing of the Marine Services Agreement by Johor Port Bhd and PPL enables the provisioning of marine services and attractive tariff for vessels that receive Gassing Up and Cooling Down (GUCD) services at PLL’s Regasification Terminal Pengerang (RGTP).The GUCD is a specialised service of bringing the storage tanks on liquefied natural gas carrier (LNG) vessels to a natural environment and cooling it down to cryogenic temperature (minus 160 degrees Celcius).

27 Mar 2014

BMT Designs Jetty for New Malaysia Refinery Construction

MOLF at Johor: Image courtesy BMT

BMT Asia Pacific Pte Ltd (BMT), says it has completed a concept design for the Material Off Loading Facility (MOLF) at Petroliam Nasional Berhad’s (Petronas’) proposed Refinery and Petrochemical Integrated Development (RAPID) complex in southeast Johor, Malaysia. The RAPID project will help to address the growing need for petroleum and commodity petrochemical products in the Asia Pacific region. The proposed RAPID refinery will have a capacity of 300,000 barrels per day that will produce naphtha and liquid petroleum gas (LPG) feedstock for the RAPID petrochemical complex…