McDermott International, Inc. informs that one of its subsidiaries has been awarded a large engineering, procurement, construction and installation (“EPCI”) project by an operator in the Arabian Gulf. The award is included in McDermott’s fourth quarter 2013 backlog. The contract includes the engineering, fabrication, transportation and installation of four new offshore topsides facilities, plus modification of two existing production facilities to extend the current deck space and maximize the size of modules. The combined total weight of the structures will exceed 3,500 metric tonnes.