Marine Link
Friday, April 26, 2024
SUBSCRIBE

Texas State Highway News

29 Sep 2022

Runaway Barge Near Corpus Christi

(Photo: U.S. Coast Guard Sector Corpus Christi)

A barge has gone adrift and ran aground near the Packery Channel in Corpus Christi, Texas on Thursday.The U.S. Coast Guard said it received a call at 7:45 a.m. from a driver on Texas State Highway 361 stating they saw an adrift barge floating in the Packery Channel between the boat ramp and the jetties. The barge was loaded with rocks and drifting outbound.The Coast Guard notified Callan Marine, the company contracted to repair the jetty using the barge, and issued a safety marine information broadcast to alert nearby mariners and beachgoers to the potential hazard.

15 Jul 2011

Port Aransas Ferries Begin Service

(Image courtesy of Southwest Shipyard)

The first two of a new class of vessels designed by Seattle-based Elliott Bay Design Group LLC (EBDG) and built for the Port Aransas Ferry Service went into operation on July 1. EBDG was selected by the Texas Department of Transportation (TxDOT), Corpus Christi District, to prepare the design for this new 160-ft, double-ended ferry serving as a continuation of Texas State Highway 361 across the Corpus Christi Channel, between Port Aransas and Harbor Island. The new vessels, the Michael W. Behrens and the Charles W. Heald, are named for former directors of the transportation department.

25 Feb 2009

Major Ferry Design Projects for EBDG

Elliott Bay Design Group LLC (EBDG) has a number of major ferry design projects in progress with clients from across the country, including many repeat customers. In early 2008 the Texas Department of Transportation (DOT), Corpus Christi District selected EBDG to design a new 28-car ferry for service between Port Aransas and Harbor Island. This short route forms the continuation of Texas State Highway 361 across the Corpus Christi Channel. The multi-phased design effort began with a Design Study Report, which included a hull and superstructure configuration study, propulsion and steering configuration and cost studies, and a capital cost study. Follow-on phases include Contract Design, Bid Support and Construction Liaison.

17 Jun 2008

EBDG to Design Port Aransas Ferry

Seattle-based Elliott Bay Design Group LLC (EBDG) was selected by the Texas Department of Transportation (TxDOT), Corpus Christi District, to prepare a design for a new 28-car ferry for service between Port Aransas and Harbor Island. This short route forms the continuation of Texas State Highway 361 across the Corpus Christi Channel. This multi-phased design contract was awarded in January 2008 with the first effort being a Design Study Report. The Design Study Report included a hull and superstructure configuration study, propulsion and steering configuration study, propulsion and steering cost study and a capital cost study. Follow-on phases include Contract Design, Bid Support and Construction Liaison.