North Sea Tiffany Platform to Restart Mid-August

Posted by Eric Haun
Thursday, August 07, 2014

Canadian Natural Resources Ltd said on Thursday its Tiffany production platform in the North Sea was expected to restart in mid-August after a shutdown.

On a second-quarter earnings call, CNRL Chief Executive Officer Steve Laut said international production had decreased to 25,800 barrels per day in the quarter.

That was mainly due to the production shutdown at Tiffany, which accounted for 4,500 bpd.

(Reporting by Nia Williams; Editing by Lisa Von Ahn)

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Energy

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

News

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Offshore Energy

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Update: Explosion in the Gulf of Mexico

An explosion occurred aboard a production platform Thursday at West Delta 105, operated by Fieldwood Energy, resulting in one fatality and three injured. The Bureau

Deepwater Semi-Sub COSL Prospector Delivered

COSLProspector, the fourth deep-water semi-submersible drilling rig built by CIMC Raffles for China Oilfield Services Limited (COSL), has been delivered in Yantai, Shandong Province.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 4.9064 sec (0 req/sec)