BAE Systems Awarded Two Navy Contract Modifications

By George Backwell
Monday, August 18, 2014
USS Howard: USN photo

U.S. Department of Defence informs it has awarded two contract modifications to BAE Systems San Diego with a total value of US$21,082,100 for the SRA of USS Howard and USS Ardent, as follows:

1. USS Howard
BAE Systems San Diego Ship Repair, San Diego, California, is being awarded a $13,684,941 modification to a previously awarded cost-plus-award-fee/incentive-fee contract (N00024-11-C-4408) for the USS Howard (DDG 83) fiscal 2014 selected restricted availability (SRA). (A SRA includes planning and execution of depot-level maintenance, alterations, and modifications that will update and improve the ship's military and technical capabilities.)

Work will be performed in San Diego, California, and is expected to be completed by February 2015. Fiscal 2014 operations and maintenance (Navy) and working capital fund contract funding in the amount of $13,684,941 will be obligated at the time of award. Contract funds in the amount of $12,793,832 will expire at the end of the current fiscal year.

The Southwest Regional Maintenance Center, San Diego, California, is the contracting activity.

2. USS Ardent
The second contract is a $7,397,159 modification to a previously awarded cost-plus-award-fee contract (N00024-08-C-4405) for the USS Ardent (MCM 12) fiscal 2014 selected restricted availability (SRA).

Work will be performed in San Diego, California, and is expected to be completed by March 2015. Fiscal 2014 operations and maintenance (Navy) and working capital funding in the amount of $7,397,159 will be obligated at the time of award. Contract funds in the amount of $7,339,333 will expire at the end of the current fiscal year.

The Southwest Regional Maintenance Center, San Diego, California, is the contracting activity.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Bollore Africa Logistics Sees Profit Plunge in H1

First half 2014 profit at shipping company Bollore Africa Logistics plunged to 5.89 billion CFA francs ($11.48 million) from 9.45 billion CFA francs in the same period last year,

Ocean Rig, Petrobras Agree to $1.1b Drill Ships Lease

Cyprus-based Ocean Rig UDW Inc said on Monday that it signed a $1.1 billion three-year contract with Brazil's state-run oil company, Petroleo Brasileiro SA, to

Thrustmaster Announces Factory Expansion

Thrustmaster of Texas, a manufacturer of commercial marine propulsion products, signed a deal last week to expand its Houston-based production facility by 100,000 sqft (93,000 sq m).

Contracts

Ocean Rig, Petrobras Agree to $1.1b Drill Ships Lease

Cyprus-based Ocean Rig UDW Inc said on Monday that it signed a $1.1 billion three-year contract with Brazil's state-run oil company, Petroleo Brasileiro SA, to

Rolls-Royce to Design, Equip Stern Trawler for Ramoen

The Armon shipyard in Gijón, Spain has entered into a contract to build a new Stern Trawler for the Norwegian fishing company Ramoen. The vessel will be a Rolls-Royce design,

India to Develop Iran's Chabahar Port

India will float a company to develop Iran's Chabahar Port, a government statement said on Saturday, as New Delhi aims to take advantage of a thaw in Tehran's relations with world powers.

Ship Repair & Conversion

Messer to Debut MetalMaster Xcel

Messer Cutting Systems said it has answered the call from manufacturers that have been demanding a faster, more accurate way of producing cut parts. Messer’s

Rolls-Royce Expands in the Canary Islands

Rolls-Royce announced it has signed a cooperation agreement with the Astican Shipyard in Las Palmas, Canary Islands that it said will enhance the service capabilities

USS Constitution Not to Set Sail Until 2018

The crew of USS Constitution embarked on their final Boston Harbor underway demonstration aboard Old Ironsides this year, Oct. 17. Constitution set out into

Navy

Mount Whitney Departs Batumi, Georgia

The U.S. 6th Fleet command and control ship USS Mount Whitney (LCC 20) departed Batumi, Georgia, Oct. 18 after completing a successful port visit. While in Batumi,

USS Constitution Not to Set Sail Until 2018

The crew of USS Constitution embarked on their final Boston Harbor underway demonstration aboard Old Ironsides this year, Oct. 17. Constitution set out into

US Navy to Christen Littoral Combat Ship Detroit

The Navy will christen littoral combat ship (LCS) Detroit, on Oct. 18 during a ceremony at Marinette Marine Corporation shipyard in Marinette, Wisconsin. Secretary of the Navy Ray Mabus,

Vessels

Cruise Ship Returns to Texas after Ebola Concern

The Carnival Magic cruise ship was en route back to the United States on Saturday with a passenger from Texas who might have handled specimens of the first Ebola

'New Tango' Brings More Post-Panamax Ships to Charleston

New service expands Port of Charleston's capacity to serve North-South trade The SC Ports Authority today received the first ship call of a new consolidated

Video: E-Class Edith Mærsk on the Thames

The largest ship ever to enter the Thames arrived at DP World London Gateway, the U.K.’s new deepwater container port. The 397-meter-long, 56-meter-wide Edith Mærsk

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3380 sec (3 req/sec)