AXYS Deliver Newfoundland Oceanogrphic Buoys

Press Release
Wednesday, April 10, 2013
AXYS Watchkeeper Buoy: Photo courtesy of AXYS

AXYS Technologies Inc. deliver 8 oceanographic buoys to the Fisheries & Marine Institute of Memorial University of Newfoundland (Marine Institute ).

The buoys will expand the existing ocean observing network, known as “SmartBay ”, located at Placentia Bay along Newfoundland’s southern coastline. The data provides fishermen, vessel operators, weather forecasters and other stakeholders near real time access to a variety of marine meteorological and oceanographic data. The Marine Institute plans to deploy the buoys in the spring and summer of 2013, with one 3 Metre buoy replacing a long-running station scheduled for a major refit.

The delivered buoys include four 3 Metre buoys, two WatchKeeper ™ buoys and two TRIAXYS ™ directional wave buoys. The large platform 3 Metre and WatchKeeper™ ODAS buoys have similar configurations to the systems previously provided to this program and will be established as permanent stations. The smaller TRIAXYS™ buoys will provide wave climate data in various locals and may be seasonal in operation.

All systems are designed and built to withstand the harsh marine conditions experienced in coastal Newfoundland waters.  The large ODAS buoys come equipped with various meteorological and oceanographic sensors to report synoptic conditions. The data collected/processed by the WatchMan500 ™ controller is then transmitted to a central data server via Iridium satellite or VHF telemetry. The 3 Metre and WatchKeeper™ buoys are fitted with a Type I Automatic Identification System (AIS) transmitter, which allows nearby vessels to access the buoy’s data.

SmartBay began as an environmental monitoring demonstration project in Placentia Bay with the goal of creating awareness of the importance of better observing the marine environment. In 2006 AXYS supplied one 3 Metre buoy and in 2010 supplied an additional 3 Metre buoy and one WatchKeeper™ buoy. Real-time and archived data is freely available to the public. The data is used to develop custom weather and sea-state forecasts for Placentia Bay and is available here.

 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

AEGIR-Marine Partners with On Site Alignment

AEGIR-Marine and On Site Alignment (OSA) signed a contract at SMM in Hamburg confirming the companies’ strategic alliance concerning stern seal and propulsion service

Brommeland to Supply KNS VSATs to Kopervik

Brommeland Elektronikk AS, the Norwegian distributor for KNS, was awarded a contract to supply 13 VSAT systems to a large part of the Norwegian shipowner Kopervik Group fleet.

Seaspovill Orders Second Damen Fast Ferry

South Korean operator Seaspovill signed its second contract for a Fast Ferry with the Netherlands-based shipbuilder Damen Shipyards Group. The Fast Ferry 4212 -

Marine Science

TRIYARDS' Liftboat Orderbook Filling up

*This new order brings total liftboat contracts to date to 14, and showcases TRIYARDS’ engineering versatility * Win affirms TRIYARDS' leadership position as

SBM Offshore Announces Thunder Hawk Tiebacks

SBM Offshore is pleased to announce it has signed a Production Handling Agreement (PHA) with Noble Energy to produce the Big Bend and Dantzler fields to the

PPG Offers SIGMASHIELD 1200 Coating for Shipping

PPG Industries' protective and marine coatings business is fulfilling growing demand for "ice class" marine coatings for hull protection with SIGMASHIELD® 1200 coating.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1087 sec (9 req/sec)