Odfjell Orders Ships

Monday, July 05, 2010

Odfjell signed an agreement with Daewoo Shipbuilding & Marine Engineering Co., Ltd (DSME) to build one fully IMO II 75,000 dwt chemical tanker with 31 coated tanks for delivery first half 2013 at a total price of about $65m.

On the same date our J/V partners National Chemical Carriers of Saudi Arabia (NCC) has ordered a sister vessel with expected delivery late 2013. The ships will be commercially operated by our J/V NCC Odfjell Chemical Tankers JLT (NOCT), based in . Both Odfjell and NCC have options for one more vessel each.

 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ESSA's Fleet Upgradation Environmental Driven

State-controlled Exportadora de Sal SA de CV of Mexico ("ESSA"), one of the world’s largest salt exporters with a 10-million-ton annual production, has strengthened

Kleven Wins New Yacht Contract

Norwegian ship builder Kleven has secured a new contract for a high specification, 116-metre long Expedition Support Vessel. The order is placed by Mr Graeme Hart,

World’s First LNG-Ready Ultra Large Container Ship Named

The race is on in global maritime circles to be the “world’s first” in every aspect of environmental friendliness, particularly in regards to the incorporation of LNG as fuel onboard commercial ships.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1043 sec (10 req/sec)